Presentation is loading. Please wait.

Presentation is loading. Please wait.

NCSA Project Management Committee Meeting April 4 th, 2007 10:00 am EEAA Premises 6 th floor.

Similar presentations


Presentation on theme: "NCSA Project Management Committee Meeting April 4 th, 2007 10:00 am EEAA Premises 6 th floor."— Presentation transcript:

1 NCSA Project Management Committee Meeting April 4 th, 2007 10:00 am EEAA Premises 6 th floor

2 Content of the presentation 1) NCSA Project outputs 2) What did we achieve? 3) Where we are now? 4) How we intend to end?

3 1)NCSA Project outputs “ original in project document”  Three stocktaking & gap identification reports of the three thematic areas:  Desertification.  Biodiversity.  Climate change.  Synergy and prioritization report.  In-depth studies report.  Capacity Development Action plan. --------------------------------------------  Management of PMU  Awareness raising (Bezra and others)

4 2) What did we achieve?  Three thematic reports ( biodiversity- climate change – desertification).  Nationalization of MDG 7.  Synergy and prioritization report.  In-depth studies of 5 cross cutting capacity constrains ( draft ready for consultation).  Implementation of Bezra summer/school campaign.  Development of CB2 project proposal “mainstreaming of the global environment in national development plans and policies by strengthening the monitoring and reporting system for multilateral environmental agreements in Egypt”

5 3) Where we are now?  Consultation of in-depth studies Review of in-depth studies by panel of advisors  Development of the action plan.  Two consultation workshops (National & Donors) for discussion of the action plan.  High level endorsement of the action plan.  Preparation of Environmental awareness campaign (Protecting our Global Environment – our right) in cooperation with El Sawy culture Wheel.

6 4) How we intend to end?  Finalizing & printing of the in-depth studies report (end of May 2007)  Production of the capacity development action plan that links the 3 conventions with possible funding sources ( end of july – August 2007)  Conduct & evaluate the Environmental awareness campaign with El Sawy culture Wheel  Conduct & evaluate the Environmental awareness campaign with El Sawy culture Wheel ( end of june 2007).  Production of NCSA process report (final project report indicating the experience & lessons learned)( September 2007).

7 Thank you


Download ppt "NCSA Project Management Committee Meeting April 4 th, 2007 10:00 am EEAA Premises 6 th floor."

Similar presentations


Ads by Google