Download presentation
Presentation is loading. Please wait.
Published byCarmel Dawson Modified over 8 years ago
1
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab, 13 January 2012
2
Rutherford Appleton Laboratory, Oxfordshire ISIS
3
3 World’s most productive spallation neutron source (if no longer highest pulsed beam power) Flagship STFC facility [Science & Technology Facilities Council] Driven by UK’s high-power proton accelerators UK has largest national neutron user community of any country Accelerator physics necessary for continuing operational development - and also for enabling entire programmes on materials R&D Need to plan for upgrades
4
4 ISIS science World-leading centre for research in the physical and life sciences Neutron and muon instruments for properties of materials in terms of molecular structure National and international community of >2000 scientists Research fields include clean energy, the environment, pharmaceuticals and health care, nanotechnology, materials engineering and IT ~450 publications/year (~9000 total over 26 years) MICE (Muon Ionisation Cooling Experiment)
5
5 ISIS Fundamental purpose - to investigate structure and dynamics of molecular matter Complements light sources (Diamond) Neutrons: ~0.1 eV → ~1Å StructureAtomic motionsParacetamol
6
Global challenges ISIS Energy Living with environmental change Global threats to security Ageing: Life-long health and wellbeing Digital economy Nanoscience: through engineering to application Impact of ISIS science e c s h d n
7
7 ISIS organisation Accelerator Division - accelerator operations + R&D Design Division - engineering, accelerators + neutron instruments Experimental Operations Division - target operations, sample and environment Instrumentation Division - neutron counters, data acquisition Science Diffraction Division - crystallography, disordered materials, large-scale structures Spectroscopy and Support Division - excitations, molecular spectroscopy, muons
9
9 RFQ: 665 keV H –, 4-rod, 202 MHz Linac: 70 MeV H –, 25 mA, 202 MHz, 200 µs, 50 pps Synchrotron:800 MeV proton, 50 Hz 5 µC each acceleration cycle Dual harmonic RF system Targets:2 × W (Ta coated) Protons: 2 × ~100 ns pulses, ~300 ns apart Moderators:TS-1: 2 × H 2 O, 1 × liq. CH 4, 1 × liq. H 2 TS-2: 1 × liq. H 2 / solid CH 4, 1 × solid CH 4 Instruments:TS-1: 20TS-2: 7 (+ 4 more now funded) ~340 staff
10
–35 kV H – ion source
11
665 keV 4-rod 202 MHz RFQ
12
70 MeV 202 MHz 4-tank H – linac
13
1.3 – 3.1 & 2.6 – 6.2 MHz 70 – 800 MeV proton synchrotron
14
Superperiods 9, 0 and 1 of 800 MeV synchrotron
15
EPB1 and EPB2 to TS-1 and TS-2 above synchrotron Protons to TS-1 Protons to TS-2
16
ISIS TS-1 experimental hall, 20 instruments
17
ISIS TS-2 experimental hall, 7 instruments + 4 under way
18
TS-1 tungsten target, plates
19
TS-2 tungsten target, solid cylinder
20
20 Typically 180 days a year running for users Maintenance/shutdown ~1 – 2 weeks machine physics + run-up ~40 day cycle ~3 day machine physics ~250 days a year machine running overall Obsolescence mitigation programme ~10% of annual budget e.g. synchrotron main magnet power supply ~5/year
21
21 1998 – 2002 2003 – 2007 2007 – 2011
22
22
23
23 ISIS accelerator operations depend on accelerator R&D Need skilled, knowledgeable and experienced staff to maintain ISIS operations sustainably – for example Greater beam powers for two target stations Hands-on maintenance – regulatory issues Accommodating MICE Need to enable accelerator staff to engage with similar staff elsewhere Need to look forward to possible ISIS upgrades
24
24 ISIS – Accelerator R&D Front End Test Stand To demonstrate key technologies for front ends of next generation of high-power pulsed proton accelerators Only dedicated high power proton accelerator hardware R&D in UK Ring R&D Theory cf. measurement, benchmarking, … Exploits rare opportunities for accelerator physics measurements on high-current ring ISIS upgrades To build on current success of ISIS
25
65 keV, 60 mA, 2 ms, 50 Hz, H – ion source 3-solenoid magnetic LEBT 324 MHz, 3 MeV, 4-vane RFQ MEBT and beam chopper Beam diagnostics and beam dump Laser profile measurement Front End Test Stand Ion source collaborations: CSNS, CERN, Culham, Oxford Alan Letchford’s talk earlier
26
2) ~3.3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW, perhaps more) 3) Charge-exchange injection from 800 MeV linac (2 – 5 MW) 1) Replace 70 MeV ISIS linac by new ~180 MeV linac (~0.5 MW) ISIS MW Upgrade Scenarios My talk later
27
27 Studies of coherent resonances ISIS ring nominal tunes Q x, Q y = 4.31, 3.83 Tune decreases as current increases — avoid 2Q y = 7 ! Predicted onset of resonanceStorage ring mode
28
28 Simulations and measurements of beam bunches Simulations at 0.0 ms (end of injection) and 0.5 ms (peak trapping loss) cf. measurement Simulation (black) Measurement (orange) Understanding and optimising dual harmonic performance will be key to increasing ISIS operational intensity 0.0 ms0.5 ms 1RF DHRF
29
Time (ms) Beam loss ORBIT simulations, 600k particles, 64 CPUs, 3-D space charge Simulated beam loss: 9 % Measured beam Loss: 8 % ISIS beam loss simulations using ORBIT
30
30 Key areas of accelerator expertise at ISIS Essentially: science and technology of proton accelerators with benefit of operational experience Optimal application of electrical, electronic, mechanical, RF and vacuum engineering Ability to calculate beam dynamics in detail – including benchmarking codes in standard and non-standard states (e.g. coasting beams) Design and operation of beam diagnostics devices and interpretation of the signals arising from the devices
31
31 Key areas of accelerator expertise – continued Appreciation of the practical problems posed by high-power beam stops and collimators, induction of radioactivity in machine structures, etc. – including high-power targets State-of-the-art code development and hardware architecture for running the codes Assessment of the implications for ISIS of facilitating other R&D programmes such as MICE
32
32 Overall aims – Accelerators Run ISIS sustainably Prepare for ISIS upgrades Act as centre/host for proton accelerator R&D in UK Collaborate nationally and internationally
33
33
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.