Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS
2
From the Start Center, click on New Work Order icon in the Quick Insert application
3
The application open’s with a Work Order number already inserted into the box. Type in a short description of the work to be performed
4
Click on the Long Description box to enter a full text edit of the work to be performed or a full explanation of the work needed to be done
5
2. Enter only information that can help the worker know what possible tools and materials he/she may need to carry to the work as an initial evaluation of what is to be done 1. Provide as much info as possible 3. Click OK when finished entering description
6
Click on the detailed menu arrow by Location WAPPR
7
On any detailed menu, select the option that you want to search by. Click on Select Value
8
1. The Select Value box opens and from here we either use the browse next/previous page arrows 2. Or type in a location and press enter on the keyboard
9
1. Select from the list or browse using next/previous page 2. Select TK-91
10
Select Menu arrow Asset
11
1. Select Value icon
12
1. Only the first 500 assets can be found using the browse next page arrows 2. Type in a description i.e.. TANK TANK
13
Use the next page arrow to scroll through assets
14
Select the Asset number
15
Select Classification menu arrow and Go To Classifications
16
Type in the item to classify
17
If this is the item you wanted to classify the WO to select return with value, if not click on List and do another item search
18
1. Select Work Type
19
Select code for Work Type
20
Select GL Account search icon
21
Type in a description or use the next page scroll arrows
22
Select the Zone that the work is being performed for
23
Select the appropriate charge to
24
Select the account
25
Select OK
26
Type in the department, Zone/Facility and Unit/Bldg. Select the search icon for Failure Class
27
Select the Failure Class of the Asset, use scroll next or type in a description
28
Select Code once found
29
Enter the Maintenance Planner’s Name
30
1. Check the boxes as appropriate for the WO to track 2. Select Menu for Job Plan and select Go To Job Plans
31
Select All Records or select Bookmarks All records displayed Choose the plan that is appropriate
32
If this is a plan you want to use for the work, select return with value
33
Select Menu for Safety Plan
34
Select Go To Safety Plans
35
Click on the search, then all records
36
If the plan you want to use is here select it. If not, you can create a safety plan in the Plans Tab on the Work Order Once selected, the plan info will show and select return with value to place the plan on the work order
37
Select Priority code, Priority Justification and Risk Assessment Use select value
38
Select Target Start Date
39
Set the Target Start Date, for training set to September 1 st at 08:00 Use the next month arrow and set time to 08:00
40
Now do the same for the Target Finish. Maximo requires these to be set before the WO can be saved
41
Set month to September using the next month arrow Set time to 4:30 PM
42
1. Set the duration of work, the time in hours to complete the task 2. If this wo is from a service request enter the request number 3. Select if wo can be interrupted
43
Select who report the work
44
1. Click select value 2. This select value screen will appear. Select the person who reported the work
45
1. Select menu 2. Select Value
46
Identifies for whom this work order has been created. For example, if someone did not have access to a computer, another user could create the work order on behalf of that person.
47
Select Supervisor
48
Select the Supervisor
49
Select Lead/Craft
50
Select Value
51
Type in persons name or scroll menu to next page
53
Select Value
56
Click on the Plans Tab
57
One task has already been inserted from the Plans that were selected on the work order screen. If another task needs to be created, click on the new row button and input the required information.
58
1. Type in a description of the task Repair crack in Coil 2. Click on the long description box and enter a more detailed description of the work
59
Click OK when finished
60
Enter estimated duration of work
61
Select any value for inspector, MP, MV and date that is needed
62
Select Value
63
Use the next page arrows to scroll or type in a persons name and press enter on keyboard
64
Click on the persons name to add them to the task
65
Click on the Labor Tab
66
1. One Craft has already been added from the Plan selected for the work order 2. To Add another Labor, click on new row and select the required information
67
Use the select menu arrows to select the right info
68
Select Craft
69
Once all information is entered, select the Materials Tab
71
Here a circuit Breaker Lockout kit has already been selected, to add other materials select new row A new row has already been opened, use the select menus to find and enter the materials needed
72
Recommend select go to item master
73
Several ways to search for materials, simplest is to type in a description on the item and press enter Gloves Below is the search results, click on an item to open it’s location
74
Once you have verified that this is the material or item you wanted, click on return with value
75
Fill in Quantity and Storeroom
76
Go To Storerooms
77
Select the arrow by search and select all records Tip: Once you find a storeroom that you will use frequently, bookmark it for future use
78
Select the storeroom
79
Click return with value
80
1. If a select person is to be issued the materials, check direct issue and Issue to 2. Click on Services Tab
81
1. Clicking on Select Standard Services will open this window, usually not used in work order creation 3. Click the Tools Tab 2. Click cancel
82
Click on New Row to add tools needed
83
1. Select the task that the tool is needed for
84
Select which task the tool is for
85
Select Value
86
Select the tool that is required
87
1. You may also want to use the Go To Tools option 2. The Tools record opens and from here select search and all records to see a list of available tools
88
1. In this training presentation there is only the one tool listed, in the production environment there should be more 2. Click on the tool to open the tool description 3. Once you have verified that this is the correct tool needed for the work, click on return with value
89
1. Check the quantity and enter how many of this tool will be needed. Some require more than one of the same tool 2. For some tools you may needed to track the hours that the tool is in use. This would be for tools requiring maintenance on an hour meter and Maximo will track this items hours and keep the record up- to-date 3. If more tools are needed for this task or another task, click on new row to search for the tools
90
Click on the related records tab
91
1. Select any related work orders or tickets that are associated with this work 2. Click on Actuals Tab
92
3. Click on Safety Plan Tab 1. The actuals tab is used for keeping track of the actual resources that were used for this work. Labor hours, Materials, Services (could have required any outside contractor that was not initially planned for) and Tools 2. When completing the work order, be sure to fill in the information here so that Maximo can track the cost of this work
93
Click New Row under Hazards and Precautions
94
1. Select any Hazard, Hazardous Materials and Lock Out/Tag Out that may be related to the work assignment. Use the tabs to move through the Safety Plan 2. Click on select menu
95
Select Value
96
Select the Hazard For training there is only the one hazard listed, in production there are more to choose from
97
Click on the Hazardous Materials Tab
98
To add a hazardous material click on new row 1. Use the select menus to add a hazardous material to the work order and describe each. 2. Search for the type of hazard
99
Once all hazardous materials have been identified, click on the Lock Out/Tag Out Tab Lock Out and Tag Out of equipment is not just a requirement, it is the core value of any safety program. Click on new row to add requirements for this work.
100
Here we list hazard that requires lock out or tag out and we use the select menu arrows to select the hazards
101
1. You use the same method to select the values as before, do this for each hazard 2. List the Tag Outs for the Hazard above, click new row
102
Just as before use the select value arrows to select the values for tagging out items
103
After selecting all Hazards, Tag Outs and Lock Outs, Click on the Log Tab
104
1. Here we list notes for the work that is being done, notes maybe to notify others of some problem, a record that needs to be completed, a tool requirement that may not be in the system or any other note that may be of interest to future work on this equipment
105
Click on the Communications Tab
106
1. You use the Create Communication action to send messages about a record via e-mail. When you create a communication, you can use a communication template created in the Communication Templates application, or you can create a free-form communication. You can view any inbound or outbound communications associated with a record in the Communications Log on the Log tab. For more information about communication templates, refer to the Communication Templates in help. 2. Click Failure Reporting Tab
107
1. You use the Failure Reporting tab to record and view asset and location problems, causes, and remedies. This data enables you to identify trends and isolate probable causes of breakdowns. You can enter remarks in the Remarks box that will aid in future resolutions of problems associated with the root cause of this failure 2. To change the failure code you must first delete the failure code from the work order page and then select a new code here. 3. After going through each step in creating this work order and proving the information required for the system to track the progress, labor, materials and cost, clickk on the Save icon to save the work order.
108
The record has now been saved, if you have approval authority, approve the work
109
1. Click on the select arrow 2. Click on Approved
110
Approving the work on any section of the work order will also approve the task created for the work
111
1. All work info entered and approved. The work is now pending scheduling by the work scheduler. At any point in creating a work order and you get stuck on something, looking for