Download presentation
Presentation is loading. Please wait.
Published byNeil Bates Modified over 8 years ago
2
The Investment Coordinating Board of the Republic of Indonesia 2 PROJECT TITLE Soekarno-Hatta International Airport – Jakarta Railway LOCATION DKI Jakarta and Banten Province CONTRACTING AGENCY Ministry of Transportation PROJECT BACKGROUND Currently, Jakarta population has exceeded 10 million people and only one access to the airport via the toll road. With an annual total of 51,5 million passengers and annual increase of 15%, it caused a need of alternative transportation in order to respond toward the tremendeous groth. Contact TENTATIVE SCHEDULE 2012 Project preparation by the Ministry of Transpo rtation 2013 Assessment of Guarant ee and Government Si upport June-des’ 13 Markt Soundi ng and roads how by BKP M June 14 PQ Soekarno-Hatta International Airport – Jakarta - Manggarai Railway SCOPE OF WORK 1.Development of the railway that connects the airport terminal to the Manggarai-Soekarno Hatta airport has a total length about 33 km (6 stations). 2.Design, build, finance, operate, and transfer the entire railway and associated facilities at the government at the end of the concession period. ESTIMATED INVESTMENT COST Estimated project value: US$ 2.57 billion PPP MODALITY BOT (to be decided) PPP Projects
9
The Investment Coordinating Board of the Republic of Indonesia 9 Perluasan Pelabuhan Tanjung Priok – Cilamaya, Karawang Barat PROJECT TITLE Expansion of Tanjung Priok Port, Cilamaya Karawang West LOCATION Kabupaten Karawang, Jawa Barat CONTRACTING AGENCY Kementerian Perhubungan LATAR BELAKANG Future growth of shipping activities in West Java have to be accommodated by an adequate port facilities. To support this, the expansion of the Port of Tanjung Priok - Cilamaya needs to be done. This will reduce transportation costs for industry in the northern region of West Java and increase the comparative advantage for export commodities. CONTACT Head of Transportation Agency, West Java Province Jl. Sukabumi I Bandung, INDONESIA Tlp : +62 22 7272258 Fax : +62 22 7202163 Transportation Service and Partnership Analysis Center, Minsitry of Transportation. Cipta Building 6th Floor Jl. Medan Merdeka Barat No.8 Jakarta 10110, INDONESIA Tlp : +62 21 3517608 Fax : +62 21 3852671 2013 Project Preparatio n 2014 Tender 2015 Contract Signing 2015-2 018 Construction 2019 Operation SCOPE OF WORK Harbor area is about 250 ha with elevation of 4 meters above sea level : 1. Reclamation area about 140 ha. 2. Ciparage coastal area about 110 ha. Harbor pond depth : 13 m. Harbor pond length : 1.25 km. Harbor pond pier : 2.5 km. Total pier length : 3.4 km.. ESTIMATED INVESTMENT COST Estimated Project value: US$ 1032,36 million Land Acqusittion Value: US$ 2,36 million TENTATIVE SCHEDULE US$ 1 = Rp 10.500 PPP Projects
10
The Investment Coordinating Board of the Republic of Indonesia 10 PROJECT TITLE Soekarno-Hatta International Airport – Jakarta Railway LOCATION DKI Jakarta and Banten Province CONTRACTING AGENCY Ministry of Transportation PROJECT BACKGROUND Currently, Jakarta population has exceeded 10 million people and only one access to the airport via the toll road. With an annual total of 51,5 million passengers and annual increase of 15%, it caused a need of alternative transportation in order to respond toward the tremendeous groth. Contact Hanggoro Budi Wiyawan Direktur Lalu Lintas dan Kereta Api Kementerian Perhubungan Jl. Medan Merdeka Barat No.8, Gedung Karta lantai 11, Jakarta 10110 INDONESIA Tlp : +62 21 3506526 Fax : +62 21 3506526 Email : llakainvestasi@gmail.com, sekretaris.dllaka@gmail.com TENTATIVE SCHEDULE May‘11 – Mar’ 1 2 Project preparati on by the Minist ry of Transportat ion Jan – M ar‘12 Assessment of g uarantee and go vernment suppo rt Akhir 20 12 Market Sounding and Ro adshow by BKPM Mar’13 Tender process by the Mi nistry of Transportation April 14 The project implementat ion by the Tender winner Soekarno-Hatta International Airport – Jakarta Railway SCOPE OF WORK 1.Development of the railway that connects the airport terminal to the Manggarai-Soekarno Hatta airport has a total length about 33 km (6 stations). 2.Design, build, finance, operate, and transfer the entire railway and associated facilities at the government at the end of the concession period. ESTIMATED INVESTMENT COST Estimated project value: US$ 2 Miliar PPP MODALITY BOT (to be decided) PPP Projects
11
The Investment Coordinating Board of the Republic of Indonesia 11 PROJECT TITLE West Semarang Municipal Water Supply PROJECT LOCATION Semarang Municipal, West Java Province CONTRACTING AGENCY Government of Semarang BACKGROUND To achieve the MDGs target and avoid land subsidence, the local government intends to offer the project under a PPP scheme. This project will supply 1,051 I/s water from Jatibarang Dam (to be completed in 2014). It will serve the Western Semarang area, consisting of 3 districts: Semarang Barat Sub District, Tugu Sub District, and Ngaliyan Sub District. CONTACT 1. Mr. Purnomo Dwi Sasongko Head of Infrastructure Divison – BAPPEDA Semarang Municipal Tlp/Fax : +62 24 3541095 Email : purnomo84@yahoo.co.id 2. Mr. Ansari Siregar President Director of PDAM Tirta Moedal – Kota Semarang Tlp : +62 24 8311210 / 8315514 Fax : +62 24 8314078 2012 Project Preparation 2013 Market Sounding by BKP M 2014 Tender Process 2015 Contract Signing 2016 Construction West Semarang Municipal Water Supply PPP Projects TENTATIVE SCHEDULE SCOPE OF WORK Intake : 1,050 lps Transmission pipe diameter : 900 mm; 2.20 km Water supply installation : 1,050 lps Main distribution pipe ; 150-700mm; 91.70 km Distribution grid with reservoir -Distribution of 4 channel total length : 15.4 km -Distribution reservoir for 5 districs INVESTMENT ESTIMATED COST US$ 50-80 million PPP MODALITY BOT (Build – Operate – Transfer) US$ 1 = Rp 9.400
12
The Investment Coordinating Board of the Republic of Indonesia 12 Kertajati International Airport PROJECT TITLE Kertajati International Airport, West Java LOCATION Majalengka Regency, West Java CONTRACTING AGENCY West Java, Provincial Government PROJECT BACKGROUND Kertajati airport development aims to reduce the burden of Soekarno-Hatta Airport that already over capacity. Furthermore, Kertajati airport development is expected to increase the revenue for Majalengka Regency from the construction and airport operations. CONTACT Mr. Dicky Saromi Head of Transportation Agency, West Java Province Jl. Sukabumi I Bandung, INDONESIA Tlp : +62 22 7272258 Fax : +62 22 7202163 Transportation Service and Partnership Analysis Center, Minsitry of Transportation. Cipta Building 6th Floor Jl. Medan Merdeka Barat No.8 Jakarta 10110, INDONESIA Tlp : +62 21 3517608 Fax : +62 21 3852671 2009-2 012 Project Preparatio n 2013 Tender 2014 Contract Signing 2014-2 016 Construction 2016 Operation SCOPE OF WORK Development of the land side facilities of the new airport consist of: terminal building cargo and passengers facilities carpark facilities eventual development of surrounding aero city/commercial business park of 3,800 Ha ESTIMATED INVESTMENT COST Estimasi Project Value: US$ 130 juta (not including Aerocity and commercial business park development PPP MODALITY To be determined TENTATIVE SCHEDULE US$ 1 = Rp 9.400 PPP Projects
13
Upcoming Power Plant Project in Indonesia
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.