Presentation is loading. Please wait.

Presentation is loading. Please wait.

SEE-GRID-SCI Grid Operations Procedures Antun Balaz Institute of Physics Belgrade Serbia The SEE-GRID-SCI initiative.

Similar presentations


Presentation on theme: "SEE-GRID-SCI Grid Operations Procedures Antun Balaz Institute of Physics Belgrade Serbia The SEE-GRID-SCI initiative."— Presentation transcript:

1 www.see-grid-sci.eu SEE-GRID-SCI Grid Operations Procedures Antun Balaz Institute of Physics Belgrade Serbia antun@phy.bg.ac.yu The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no. 211338 AEGIS Training for Site Administrators Institute of Physics Belgrade, 10-11 Dec 2008

2 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 2 Overview SEE-GRID operational and monitoring tools (and their relation to EGEE tools)  HGSM/GOCDB  Helpdesk/GGUS  BBmSAM/SAM  GStat  Nagios/CIC portal  Accounting portal Downtime procedures Upgrade procedures Grid-Operator-On-Duty (GOOD) Service Level Agreement (SLA)

3 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 3 Operational & monitoring tools HGSM HELPDESK BDII R-GMA SAM GSTAT (Taiwan) GSTAT (Taiwan) VOMS BBmSAM Accounting NAGIOS

4 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 4 HGSM/GOCDB (1)

5 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 5 HGSM/GOCDB (2)

6 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 6 HGSM/GOCDB (3) Static database containing all relevant data about all SEE-GRID and AEGIS sites Must be kept synchronized with the real situation  All sheets must be properly updated  Site Info  Contacts  Site Nodes  Downtimes  XML dumps – the easiest way to apply changes is to download XML dump of the data, edit it appropriately, and then upload the new XML file; this also allows keeping of backups

7 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 7 HGSM/GOCDB (4) The essential fields in HGSM:  GIIS URL  Monitoring: Yes  Status: certified  Type: seegrid_production, seegrid_certified, egee_production  Site Commitments Contacts and administrators All fields have to have correct values! URL: https://hgsm.grid.org.tr/

8 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 8 Helpdesk/GGUS (1)

9 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 9 Helpdesk/GGUS (2)

10 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 10 Helpdesk/GGUS (3) Central reference point for tracking of all operational and user problems Identified problems are reported through the Helpdesk and assigned to the appropriate supported If problems cannot be solved within the SEE-GRID community, they are propagated to other projects/initiatives/support systems (e.g. GGUS) URL: https://helpdesk.see-grid.eu/

11 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 11 BBmSAM/SAM

12 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 12 BBmSAM History

13 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 13 BBmSAM Portal that provides access to the database of SAM tests results Central tools for identification of operational problems Should be checked by each site admin on a daily basis Should be used to troubleshoot problems Also provides SLA figures URL: https://c01.grid.etfbl.net/

14 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 14 GStat (1)

15 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 15 GStat (2) Central tool for monitoring of the information system of SEE-GRID infrastructure Provides useful data Identifies problems with sites Should be checked by each site admin on a daily basis and used for troubleshooting  Useful ldapsearch commands can be found on GStat pages! URL: http://goc.grid.sinica.edu.tw/gstat/seegrid/

16 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 16 Nagios/CIC portal (1)

17 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 17 Nagios/CIC Portal (2)

18 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 18 Nagios/CIC portal (3) Collection of alarms raised by various tools The aim is to integrate all the tools and make the life of site admins and infrastructure managers easier In the future, automatic creation of Helpdesk tickets will be implemented URL: https://portal.ipp.acad.bg:7443/seegridnagios/

19 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 19 Accounting portal (1) Accounting by site Accounting by countries and institutions Accounting by applications

20 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 20 EGEE Accounting portal

21 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 21 Accounting portal (2) Collects the accounting data from all SEE-GRID and AEGIS sites through apel accounting publisher developed by the project Provides aggregated accounting data by site, country, institution, application Each site must publish the accounting data properly URL: https://gserv1.ipp.acad.bg:8443/Welcome/

22 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 22 Downtime procedures Downtimes must be announced well in advance (1 week is reasonable time)  There are always downtime due to hardware etc. failures that cannot be anticipated All downtimes must be entered properly in HGSM  That way they are not be counted against the site’s availability In addition, all downtimes must be broadcasted by e- mail to the GIM, APP and proper VO mailing lists Downtime should not exceed 10% of the total time (monthly, quarterly)  If yes, explanation must be provided  If the explanation is not accepted by the project management, SA1 claims will be rejected

23 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 23 Upgrade procedures All upgrades/updates are announced over the GIM list The broadcasts contain links to further instructions for upgrades for each Grid service  Site admins should carefully examine them before performing the update! In addition, possible SEE-GRID-specific instructions are given in the e-mail For especially important updates/changes, tickets are created for each site For some upgrades/updates to be performed, downtimes may be required OS updates must be regularly installed, to minimize security risks

24 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 24 Grid-Operator-On-Duty (GOOD) Rotating shifts on a weekly basis  Each country’s GIM is responsible to monitor sites during his/her shift  Tickets are submitted to sites with problems, according to the status of sites in various monitoring tools (BBmSAM, GStat, Nagios, Accounting portal, etc.)  Older tickets that are not resolved are escalated  Support is given to sites that cannot resolve earlier identified operational problems  User tickets are assigned to the appropriate supporters  Wiki documentation is updated, or new wiki pages created if necessary URLs:  http://wiki.egee-see.org/index.php/SG_GOOD  http://wiki.egee-see.org/index.php/SG_Helpdesk_tickets

25 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 25 Usual problems and links to (possible) solutions BDII  siteBDII (GIIS) or top-level BDII is Unreachable http://faq.twgrid.org/faq/index.php?action=artikel&cat=14&id=11&artlang=en  No info published http://goc.grid.sinica.edu.tw/gocwiki/No_data_published_by_top_level_BDII CA  CA version test failed with error message: This CA is an old one and time allowed to upgrade is over http://grid-deployment.web.cern.ch/grid-deployment/lcg2CAlist.html CE (Computing Element)  Job submission failed with error message: Brokerhelper: Cannot plan. No compatible resources: http://goc.grid.sinica.edu.tw/gocwiki/Brokerhelper%3A_Cannot_plan._No_compatible_resources  Job submission failed with error message: Got a job held event, reason: Unspecified gridmanager error http://goc.grid.sinica.edu.tw/gocwiki/Unspecified_gridmanager_error  Job submission failed with error message: Cannot read JobWrapper output, both from Condor and from Maradona http://goc.grid.sinica.edu.tw/gocwiki/Cannot_read_JobWrapper_output%2e%2e%2e  Job submission failed with error message: 7 authentication failed http://goc.grid.sinica.edu.tw/gocwiki/7_authentication_failed  Job submission failed with error message: 10 data transfer to the server failed http://goc.grid.sinica.edu.tw/gocwiki/10_data_transfer_to_the_server_failed  4444 Waiting jobs in the GRIS http://goc.grid.sinica.edu.tw/gocwiki/4444_Waiting_jobs_in_the_GRIS SE (Storage Element)  File copy and registration failed with error message: 535 535-FTPD GSSAPI error: GSS Major Status: General failure http://goc.grid.sinica.edu.tw/gocwiki/535_535- FTPD_GSSAPI_error%3A_GSS_Major_Status%3A_General_failure

26 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 26 Service Level Agreement (SLA) Old URL: http://wiki.egee-see.org/index.php/SG_SLA The change to the current one is that the required availability is 80%, and that the availability is calculated on 3h basis, not on a daily basis BBmSAM portal provides SLA figures Sites not fully conforming to the SLA will have reduced funding Sites with the availability <50% will be uncertified Sites fully conforming to the SLA will be put into seegrid_certified status and become visible to the whole SEE region (i.e. not only SEE-GRID, but also EGEE-SEE etc.)

27 AEGIS Training for Site Administrators, Institute of Physics Belgrade, December 10-11, 2008 27 Service Level Agreement (SLA) Currently:  AEGIS01-PHY-SCL: egee_production  AEGIS02-RCUB and AEGIS04-KG: seegrid_certified - good work!  AEGIS03-ELEF-LEDA: seegrid_production  AEGIS05-ETFBG: experimental (uncertified) – problem! All AEGIS sites must improve their availability figures, so that we provide better service to our users


Download ppt "SEE-GRID-SCI Grid Operations Procedures Antun Balaz Institute of Physics Belgrade Serbia The SEE-GRID-SCI initiative."

Similar presentations


Ads by Google