Download presentation
Presentation is loading. Please wait.
Published byJessie Waters Modified over 8 years ago
2
BSOP 330 Entire Course All Discussion Questions, Lab Assignments, Quiz Case Study For more classes visit www.snaptutorial.com BSOP 330 Master Planning All Weeks Discussion Questions Devry University BSOP330 Week 1 Lab Assignment Problems 4.1, 4.5, 4.9 and 4.11, pages 140-141 BSOP330 Week 2 Lab Assignments Chapter Four Problems 4.23, 4.27, 4.33, and 4.35
3
BSOP 330 Master Planning All Weeks Discussion Questions For more classes visit www.snaptutorial.com BSOP-330 Master Planning All Weeks Discussion Questions Devry University
4
BSOP 330 Week 1 Lab Assignment Problems 4.1, 4.5, 4.9 and 4.11, pages 140-141 For more classes visit www.snaptutorial.com Problems: 4.1, 4.5, 4.9 and 4.11, pages 140-141. Problems: 4.1: The following gives the number of pints of type A blood used at Woodlawn Hospital in the past 6 weeks: a) Forecast the demand for the week of October 12 using a 3-week moving average. b) Use a 3-week weighted moving average, with weights of.1,.3, and.6, using.6 for the most recent week. Forecast demand for the week of October 12.
5
BSOP 330 Week 2 Lab Assignments Chapter Four Problems 4.23, 4.27, 4.33, and 4.35 For more classes visit www.snaptutorial.com Chapter Four Problems 4.23, 4.27, 4.33, and 4.35. 4.23 a) Compute MAD and MAPE for management’s technique b) Do management’s results outperform (i.e., have smaller MAD and MAPE than) a naive forecast?
6
BSOP 330 Week 2 Southwestern Case study For more classes visit www.snaptutorial.com 1. Develop a forecasting model, justifying its selection over other techniques, and project attendance through 2007.
7
BSOP 330 Week 3 Lab Assignments Chapter 13 problems 13.3, 13.5, 13.9, 13.21 For more classes visit www.snaptutorial.com Chapter 12, problems 12.1 L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system? Chapter 12, problems 12.5 William Beville’s computer training school, in Richmond, stocks workbooks with the following characteristics:
8
BSOP 330 Week 4 Lab Assignments Chapter 12, problems 12.1, 12.5, 12.9, 12.15 For more classes visit www.snaptutorial.com L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system? Chapter 12, problems 12.5 William Beville’s computer training school, in Richmond, stocks workbooks with the following characteristics: Demand,500 units/year
9
BSOP 330 Week 4 Quiz For more classes visit www.snaptutorial.com BSOP-330 Week 4 Quiz
10
BSOP 330 Week 3 Lab Assignments Chapter 13 problems 13.3, 13.5, 13.9, 13.21 For more classes visit www.snaptutorial.com Chapter 12, problems 12.1 L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system? Chapter 12, problems 12.5 William Beville’s computer training school, in Richmond, stocks
11
BSOP 330 Week 4 Lab Assignments Chapter 12, problems 12.1, 12.5, 12.9, 12.15 For more classes visit www.snaptutorial.com L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system? Chapter 12, problems 12.5 William Beville’s computer training school, in Richmond, stocks workbooks with the following characteristics:
12
BSOP 330 Week 4 Quiz For more classes visit www.snaptutorial.com BSOP-330 Week 4 Quiz
13
BSOP 330 Week 4 Southwestern Case study Printing companies Programs and Inserts For more classes visit www.snaptutorial.com 1. For the programs, what are the EOQ's for both printing companies? How many orders of each size will be needed? 2. For the inserts, what are the EOQ's for both printing companies? How many orders of each size will be needed? 3. Using the EOQ's above and volume order information provided,
14
BSOP 330 Week 5 Homework Problems Mater Production Schedule Problem 1, 2 and 3 For more classes visit www.snaptutorial.com MASTER PRODUCTION SCHEDULE MAKE-TO-STOCK Beginning PAB prior to week number one is 500. If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the booked orders is larger than the forecast complete the MPS using the booked orders
15
BSOP 330 Week 5 Quiz For more classes visit www.snaptutorial.com 1.Question :(TCO 9, 10, & 12) The MPS Student Answer: must sum up to the total in the production plan. can have any quantity necessary to meet customer demand. is only used in make-to-stock manufacturing.
16
BSOP 330 Week 6 Lab Assignments Chapter 14, problems 14.1, 14.3, 14.9, 14.13 For more classes visit www.snaptutorial.com You have developed the following simple product structure of items needed for your gift bag for a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume that there is no inventory on hand of any of the items. Explode the bill of material. (Subscripts indicate the number of units required.) Chapter 14, problems 14.3 The demand for subassembly S is 100 units in week 7. Each unit of S requires 1 unit of T and 2 units of U. Each unit of T requires 1 unit of V,
17
BSOP 330 Week 7 Case Study Final For more classes visit www.snaptutorial.com Question 1. Which variations in demand for police services should be considered in an aggregate plan for resources? Which variations can be accomplished with short-term scheduling adjustments? Question 2. Evaluate the current staffing plan. What does it cost? Are 26 officers sufficient to handle the normal workload? Question 3: Determine the cost of the Chiefs plan. Do you need to implement the Chief's plan or can the current staff handle the load? Explain your thinking
18
BSOP 330 Week 7 Lab Assignments Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 For more classes visit www.snaptutorial.com Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages 640-641) 16.1 Leblanc Electronics, Inc., in Nashville, produces short runs of custom airwave scanners for the defense industry. You have been asked by the owner, Larry Leblanc, to reduce inventory by introducing a kanban system. After several hours of analysis, you develop the following data for scanner connectors used in one work cell. How many kanbans do you need for this connector? Daily demand 1,000 connectors Lead time 2 days
19
BSOP 330 Week 7 Quiz For more classes visit www.snaptutorial.com 1. (TCOs 5 & 12) Manufacturing cycle time is best defined as the (Points : 4) length of the work shift, expressed in minutes per day. time it takes a unit to move from one workstation to the next. time between the start of one unit and the start of the next unit. sum of all the task times to make one unit of a product. time from raw materials receipt to finished product exit.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.