Download presentation
Presentation is loading. Please wait.
Published byDerrick Greer Modified over 8 years ago
1
STELLA & RoboTel A prototype for a robotic telescope network? Exeter, 07/18/2005 T. Granzer, AIP
2
Scientific aims: Doppler Imaging (R 47000; S/N 200:1) RV of symbiotic stars (R 25000) Lithium in evolved stars (R 47000; S/N 70-100:1) CaII H&K survey (R 25,000; S/N >30:1) Spectrum sky survey of solar-type stars with planets (R 47,000) Early novae spectra (R 25,000) Orbital periods of cataclysmic variables Photometry and spectroscopy of XMM sources (R 25,000) Follow-up of GRB (R 25,000) Seyfert galaxies Non-radial pulsations in B-stars (R 47 000; S/N 350:1) Pulsations in close binary systems (R 47000; S/N >100) Metallicity of stars (planets) (R 47000; S/N > 100) Giant convection cells signatures Abundances in open cluster stars (R 47000, S/N > 100) Strassmeier K. G., et al., 2002 Strassmeier K. G., et al., 2000 Baliunas et al., 1998 Sun
3
Twin-telescope STELLA Tenerife / Teide 2400m Altitude 2x 1,2m telescopes AIP/IAC STELLA
4
Two 1.2m & 0.8m, f/8 Alt/Az telescopes Project STELLA STELLA-I Echelle Spectrograph, R 47000 2kx2k Marconi chip STELLA-II Wide-field imager, 22’ FoV, Strømgren filters 4kx4k STA chip 11 26 04
5
Project RoboTel RoboTel 80cm copy of STELLA, 50% educational purpose Delivery 03/15 to Potsdam Wide-field imager, 30’ FoV, Strømgren filters 4kx4k STA chip
6
Current Status: Guiding & Acquisition unit installed (July) STELLA-I Echelle spectrograph first light (07/06) Dry-run of dispatch scheduler (May)
7
STELLA dispatch scheduling: Split evaluation of merit: 1)Hard constraints: Fullfilled during expected observing cycle 2)Modified merit function: ~ ts j for long-time, g i for short-time behavior.
8
Example: DI targets
9
'Gridification' What we need: Service providers to describe telescope capabilities Common target description (RTML) Billing/accounting schema
10
'Gridification' Good to have: Scheduling for networked resources Schema for specifying observing sequences
11
Target description in XML Roofopen ∧ GuidingAvailable ∧ Goodweather AltTarget 2.50000 weight 1.0 Unique variable name Parameter range required Java class name Override defaults/ supply parameters Variables: AltTarget, AzTarget, Airmass, Elongation, SolZ, MoonDistance, MoonHeight, MoonPhase, Seeing, TauTarget, SiderealTime, JD, etc.
12
Target description cont‘d tgranzer@aip.de … TARGET_AMBIGUOUS TARGET_NOT_FOUND TARGET_NOT_AVAILABLE … hd3712_rad.xml hd4128_rad.xml hd12929_rad.xml hd18884_rad.xml hd29139_rad.xml calibration.xml User notification per e-mail Target re-schedule rules Choose sub-target from list This target will always follow
13
XML-based sequence description. Parallel and sequential execution possible. Target data filled in at run-time. Correct handling of unexpected delays. Errors occurring alter the sequence. Sequence definition, details:
14
1 2... 8 9 Task_open ∧ telescope_finished 10 MOVE_TELESCOPE 11 DONE_MOVE_TELESCOPE:main 12 13 14 on_group ∧ adapter_finished 15 FIND_ADAPTER 16 DONE_FIND_ADAPTER:main 17 18 19 20 DONE_MOVE_TELESCOPE:main ∧ DONE_FIND_ADAPTER:main+1000 21 22 ACQUIRE_ADAPTER 23 DONE_ACQUIRE_ADAPTER:main 24 25... 34 35 36 Task_guide 37 set1 38 Setup=="set1" 39 40 41 spectrograph_wavelength != Wavelength 42 SELECT_WAVELENGTH_ADAPTER 43 44 DONE_SELECT_WAVELENGTH_ADAPTER:set1 ∨ 45 spectrograph_wavelength == Wavelength 46 Reference to target type Parallel execution allowed Requirement to commence task Pure sequential execution This task is finished From target definition Update internal variables
15
Operations (envisioned): Partner: Has time share on STELLA. Partner Representative: Contact person, one per organization. Principal Operator: Responsible for scientific operation. Operator-in-charge: for all-year surveillance. Program PI: PI of individual science program.
16
Normal Targets PPI responsible for correct target format (XML based). PR monitors granted time share, supplies target to PO. PO puts target in STELLA database. OiC monitors behaviour of new target. Time share evaluated per season.
17
Quality control OiC monitors status on nightly basis. OiC might disable malevolent targets. OiC informs PR at overboarding telescope load, initiates re-validation. Science data quality within responsibility of PS.
18
Blank
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.