PRESENTATION ON FOUR WEEK SUMMER TRAINING AT PWD GORAKHPUR
Presented by: Sitara yadav CE 7th sem
2
TRAINING PROJECT: Design Finance Construction operation
Maintenance of Gorakhpur-Hata road on the basis of men, machine and material.
3
DESIGN: Design is strategy in getting appropriate projects scope fitted to specific project purpose and need. Design use a systematic approach of using limited resources to optimize the system. Design requires engineering judgement focusing on project purpose, evaluating the safety and design tradeoffs.
4
CONSTRUCTION: Preparation of soil sub grade.
Preparation of sub-base course. Preparation of base course. Preparation of surface course. Rolling, screening sprinkling of water and grouting.
5
SUB GRADE: Preparation of sub grade takes place after clearing and stump removal phase. 3 basic technique is used (a) Side cast fill (b) Full bench construction with end haul (c) Balanced road section with excavation fill in layers
6
BASE COURSE: Base course is basic layer of road construction.
It is formed with water bound macadam technique. First make surface free of dust and irregularities. Spread course aggregate properly on prepared surface to proper grade / super elevation in such quantity that desired thickness occur. Dry roll the surface. Sprinkle water and then roll again. Sprinkle the binding material at slow rate and roll.
7
EQUIPMENTS USES: Bulldozer Hydraulic excavator Roller Wheel loader
Concrete lining paver Sweeping machine Water bound macadam
8
Bulldozer Hydraulic excavator
9
Wheel loader Road roller
10
SWEEPING MACHINE: Machine is powered by a tractor.
Cleaning brush is driven by a hydraulic motor. It is used for cleaning roads, highways. Especially for cleaning WMM/WBM layers prior to bituminous coat.
11
WORKING:
12
WET MIX MACADAM PLANT: It is application designed product for preparation of homogeneous mix material of WMM base/sub base layer. It consists five units. Heavy duty four bin feeder unit Inclined slinger belt conveyor Single deck vibrating screen Pug mill unit Storage silo
13
CONTINUED…..
14
WATER BOUND MACADAM: SCOPE:
WBM consists of clean, crushed aggregate mechanically interlocked by rolling and bonding together with screening, binding material and water laid on sub grade. MATERIAL: Coarse aggregate Crushed broken stone Over burnt bricks
15
RESOURCE MANAGEMENT: MATERIAL MANAGEMENT: Global sourcing
Use of local material MAN POWER MANAGEMENT: Right man for right job Involving local work force
16
MAINTENANCE: Maintenance of road can be easy as scraping off the layer and replace it with new layer. Some time weather condition and improper construction cause breakage and incorrect sloping. Then further maintenance required Grading Ditches
17
THANK YOU
18
QUESTIONS???