Download presentation
Presentation is loading. Please wait.
Published byAshlee Stevens Modified over 8 years ago
1
CITY OF NEW BERLIN SECTION 35 Neighborhoods G & H Comprehensive Plan Amendment Public Input January 2012
2
CURRENT ADOPTED LAND USE PLAN Business Park Light Industrial (purple) – Commercial, Office, Retail Planned Conservation Development (Light Tan) - Single Family Residential
3
Adopted Development Policies – Neighborhood “G” (Source: NB 2020 Comprehensive Plan) Allow additional business office uses east of Moorland Road to respond to the growing interest in New Berlin; Pursue extension of sewer and water into Section 35; Encourage lot clustering to preserve the natural features and character; Single family housing is recommended along Grange Avenue and the eastern portion of Neighborhood “G”; Business park designation has been expanded in response to a growing Westridge Business Park, requests by property owners, and for the long-term financial success of the City (potential new value of $150 + million); This area should also include commercial retail as it supports the business park and City
4
PROPOSED FUTURE LAND USE AMENDMENTS
6
FUTURE LAND USE CHANGES ARE BASED UPON: Topography Ability to coordinate access points Maintaining buffers to existing development to the east of Sunnyslope Road, north of Grange Ave. and along College Ave. Environmental features / Gas Line Utility layout
7
TRAFFIC - EXISTING
8
TRAFFIC ANALYSIS – 2008 to 2020 traffic WITHOUT new development Add turning lanes Lengthen turning lanes 2-Lanes Add Signal 4-Lanes 2-Lanes
9
4-6 Lanes 2-Lanes Add Turn Lanes TRAFFIC ANALYSIS – WITH new development
10
TRAFFIC ANALYSIS – Comparison Chart 4-Lane 6-Lane
11
INTERCEPTOR ANALYSIS Sewer & Water Main in Sec. 34 and 35 The City and MMSD have already amended the City’s Current Sewer Service and Urban Service Areas allowing for the utilities to be brought into this area. The project is broken out into two phases and generally consists of an extension of the 36 inch interceptor sewer and a 16 inch water transmission main. Phase 1 -2012, located primarily within Section 34, includes the installation of: 2,550 linear feet of 36 inch interceptor sewer within a 60-foot wide permanent easement; 2,550 linear feet of 16 inch water transmission main within the 60-foot wide permanent easement; 2,000 linear feet of 18 inch local gravity sewer within the Moorland Road right of way; 2,350 linear feet of water main within the Moorland Road right of way; Abandonment of the Moorland Road Lift Station once Contract 2-2012 is completed. Phase 2 -2012, located primarily within Section 35, contains includes the installation of: 6,000 linear feet of 36 inch interceptor sewer within a 60-foot wide permanent easement; 6,000 linear feet of 16 inch water transmission main within the 60-foot wide permanent easement; 500 linear feet of 36 inch interceptor sewer within the Sunnyslope Road right of way; and 200 linear feet of trenchless construction across Tess Corners Creek.
12
INTERCEPTOR ANALYSIS Sewer & Water Main in Sec. 34 and 35
13
PROPOSED AMENDMENTS Additional acreage designated for business/light industrial uses Reducing the acreage designated for single- family residential (planned conservation development) Any other concepts or ideas discussed during the focus group sessions.
14
Upcoming Meetings Neighborhood 1 – Tonight Neighborhood 2 – Thursday, January 19 Neighborhood 3 – Monday, January 23 Neighborhood 4 – Wednesday, January 25 Open House – tba Public Hearing / Plan Commission Action – tba Common Council Action – tba All meetings held at New Berlin City Hall – Common Council Chambers – 6:00 p.m. DCD Staff available M-F from 8:00 a.m. to 4:30 p.m. Follow or “Like” the City’s Department of Community Development on Facebook, LindedIn and/or Twitter for news and updates.
15
PUBLIC COMMENTS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.