Presentation is loading. Please wait.

Presentation is loading. Please wait.

S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID 423630-2-52-01 Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.

Similar presentations


Presentation on theme: "S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID 423630-2-52-01 Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT."— Presentation transcript:

1 S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID 423630-2-52-01 Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT

2 S.R. A1A SIDEWALK PROJECT This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Matthews, 719 South Woodland Boulevard, Deland, Florida 32720 or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL 32399-0450. All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner.

3 S.R. A1A SIDEWALK PROJECT Exhibit Review www.CFLROADS.com Slide Show Presentation One-on-One Questions and Answers Comment Cards

4 S.R. A1A SIDEWALK PROJECT

5 Pre-Design Phase Gathering Information Existing Right-Of-Way is Not Defined Working Closely With City of Cocoa Beach City Council Voted to Support Project

6 S.R. A1A SIDEWALK PROJECT Proposed 8-ft Sidewalk on the East Side of the Northbound Travel Lanes From South 16 th Street to South 1 st Street

7 S.R. A1A SIDEWALK PROJECT

8 Proposed Swales From Edge of Pavement to Front of Sidewalk No Right-Of-Way Acquisition Locate Existing Right-of-Way (Right-Of-Way Mapping) Existing Right-of-Way Will Need to be Cleared Parking Landscaping

9 S.R. A1A SIDEWALK PROJECT Parking Landscaping

10 S.R. A1A SIDEWALK PROJECT Replace Existing 8-ft Asphalt Path on the East Side of the Roadway From Orlando Avenue to Wakulla Lane

11 S.R. A1A SIDEWALK PROJECT

12 Maintain Existing Drainage Adjustment of Existing Inlets within Existing Asphalt Path No Right-Of-Way Acquisition

13 S.R. A1A SIDEWALK PROJECT Lane Closures will be Restricted to Night Time Hours Maximize Activity During Day Light Hours Existing Speed Limits Shall be Maintained During Construction Maintain Property Access During Construction

14 S.R. A1A SIDEWALK PROJECT Survey and Design Begin – Fall 2011 Public Information Workshop – Spring 2012 Final Plans – Spring 2013 Advertising for Construction – Summer 2013 Begin Construction – Fall 2013

15 S.R. A1A SIDEWALK PROJECT Please turn in tonight or mail in by July 27th. The mailing address is on the form.

16 S.R. A1A SIDEWALK PROJECT Derek Dixon FDOT, District 5 719 S. Woodland Blvd Deland, Fl 32720 Office (386) 943-5547 Derek.Dixon@dot.state.fl.us Jeremy Dilmore, P.E. FDOT, District 5 719 S. Woodland Blvd Deland, Fl 32720 Office (386) 943-5544 Jeremy.Dilmore@dot.state.fl.us


Download ppt "S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID 423630-2-52-01 Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT."

Similar presentations


Ads by Google