Presentation is loading. Please wait.

Presentation is loading. Please wait.

1July 12th, 2002 S00VISION-20020712-006 Update of Vision Issues in ITU-R WP 8F Christine Di Lapi Motorola Inc. Global Government Relations PH: +1 202 371.

Similar presentations


Presentation on theme: "1July 12th, 2002 S00VISION-20020712-006 Update of Vision Issues in ITU-R WP 8F Christine Di Lapi Motorola Inc. Global Government Relations PH: +1 202 371."— Presentation transcript:

1 1July 12th, 2002 S00VISION-20020712-006 Update of Vision Issues in ITU-R WP 8F Christine Di Lapi Motorola Inc. Global Government Relations PH: +1 202 371 6892 Email address: p25543@motorola.com Motorola grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. Motorola is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution. This document has been prepared by Motorola to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on Motorola. Motorola specifically reserves the right to amend or modify the material contained herein and to any intellectual property of Motorola other than provided in the copyright statement above.

2 2July 12th, 2002 S00VISION-20020712-006 WP 8F’s Vision ITU-R WP 8F is charged with the development of a Vision for future development to IMT- 2000 and Systems Beyond The development of this Vision has been the focus of WP 8F’s activity at its recent 8 th meeting (29 May – 5 June) Major deliverable specifying the Vision is scheduled to be completed at the 9 th meeting (27 September – 2 October)

3 3July 12th, 2002 S00VISION-20020712-006 What is the Vision ? The Vision details the high-level objectives and requirements of future development to IMT-2000 and Systems Beyond Once the Vision is the defined, the comprehensive specification can begin

4 4July 12th, 2002 S00VISION-20020712-006 Out of the Vision Flows the Detailed Specifications... Radio Technology VisionDeveloping Liaison Satellite Co-ordination ITU-R WP8A & WP8D ITU-T SSG External Organizations Notes - Boxes and ellipse are Working Groups Spectrum ITU-R Working Party 8F Working Group relationship diagram NOTE: This figure is from Att. 2.2 of Doc. 8F/728

5 5July 12th, 2002 S00VISION-20020712-006 Documentation of the WP 8F Vision The PDNR (Preliminary Draft New Recommendation) of the Vision is the deliverable to be approved at the next WP 8F meeting Is Att. 3.2 to Doc. 8F/728 (Report of 8 th WP 8F Meeting) Represents a delicate balancing act between the diverse geo-political interests that are in the ITU-R

6 6July 12th, 2002 S00VISION-20020712-006 Current Status of the Vision PDNR At the 8 th meeting there was much discussion over “sensitive” issues, in an attempt to reach consensus –So-called “Van” Diagram –Data Rates –Timeline At the 9 th WP 8F meeting, only proposals of an editorial nature to the PDNR are to be considered (See Att. 3.3 to Doc. 8F/728 – Procedures for Conclusion of Vision PDNR)

7 7July 12th, 2002 S00VISION-20020712-006 High Level Vision (Section 4.2.1 of Vision PDNR) Future Development of IMT-2000 –Can be “envisioned” as an evolution from IMT-2000 -optimal data rates anticipated to be 30 Mb/s by year 2005 Systems Beyond IMT-2000 –Can be considered to be a revolution from IMT-2000 –Major improvement in capability –New wireless access technology likely

8 8July 12th, 2002 S00VISION-20020712-006 Illustration of Capabilities of IMT-2000 and Systems Beyond NOTE: This illustration is Figure 4-2 in the Vision PDNR

9 9July 12th, 2002 S00VISION-20020712-006 Capabilities of Systems Beyond IMT-2000: Target peak data rates of up to approximately 100 Mbit/s for high mobility applications Up to approximately 1 Gbit/s for low mobility applications such as nomadic/local wireless access

10 10July 12th, 2002 S00VISION-20020712-006 Representation of the Systems Beyond IMT-2000 Network: This is Figure 4-4 from the Vision PDNR Represents the myriad wireless access platforms that are to operate seamlessly within a Systems Beyond IMT-2000 Network

11 11July 12th, 2002 S00VISION-20020712-006 Anticipated Timeline for Future Development to IMT-2000 and Systems Beyond NOTE: This illustration is Figure 4-6 in the Vision PDNR

12 12July 12th, 2002 S00VISION-20020712-006 Focus Areas for Further Study : WP 8F will have the ITU-R set up a web site detailing focus areas for further research and study with respect to the Vision (See Att. 3.8 to 8 th meeting report) A Circular Letter from the ITU-R will be sent to members asking for participation in this research (See Att. 3.9)

13 13July 12th, 2002 S00VISION-20020712-006 Key Areas for Further Research Include... Radio Interface Access Network Related Issues Spectrum Related Issues Traffic Characteristics Market Estimations


Download ppt "1July 12th, 2002 S00VISION-20020712-006 Update of Vision Issues in ITU-R WP 8F Christine Di Lapi Motorola Inc. Global Government Relations PH: +1 202 371."

Similar presentations


Ads by Google