Download presentation
Presentation is loading. Please wait.
Published byEstella Gilbert Modified over 8 years ago
1
I ntegrated S afety M anagement High Energy Physics Division ISM__June 24, 2015 Leon T Reed
2
Presentation Overview Prior safety related incident/accident/occurrences W ork P lanning & C ontrol Division/Employee Training Chemical Waste Disposal A plan going forward ISM Month - June 24, 2015 2
3
prior safety related occurrences –Prior safety incident/accident/occurrence » electrical shock -- 09/2014 » wpc area of inspection » training requirements area for improvement » thumb laceration -- 06/2015 » training requirements area for improvement » chemical waste disposal -- 05/2015 » wpc area for improvement » training requirements area for improvement » unplanned cost $20K area for improvement ISM Month - June 24, 2015 3
4
Work planning and control (WPC), LMS POL-16 - does having a prepared work control document make the job/work any safer ?? - would having had a completed work control document for employee review prevented the accident ?? - should HEP require Work Control Document(s) WCDs for people doing work in the division ?? ISM Month _ June 24, 2015 4
5
Division/Employee Training ANL training courses result from answers provided on your JHQ, job hazard questionnaire. Review at least once each year or when the scope of the job/work changes. To eliminate training courses unrelated to your job function uncheck inappropriate responses, save the changes and submit the revised JHQ for approval. Expired individual training requirements impact the training record for the entire HEP Division. ISM Month _ June 24, 2015 5
6
Chemical Waste Disposal $20K spent for the disposal of Chemical Waste » Legacy Items » Unplanned disposal ISM Month _ June 24, 2015 6
7
A plan going forward –Regularly scheduled meetings between division safety coordinator and division Group Leaders streamline method for information transfer regarding Division feedback and Lab requirements in depth discussion about operations; work projects past, present, and forthcoming... Forthcoming –Chemical waste forecasting (LMS PROC-87) » start 4 th quarter fiscal year 2015 » division person » collect data on UMC/waste » prepare annual report that assess budget potential and future liability at minimum for yrs. 1, 2, 3, and beyond ISM Month _ June 24, 2015 7
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.