SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014
2
Agenda Progress Since July –Design Refinement –Cost Estimate –Potential Changes –Project Plan What’s Next 16SEP14S. Dixon | Conventional Facilities Update2
3
Location Plan 16SEP14S. Dixon | Conventional Facilities Update3 BNB Target SciBooNE LArTF MiniBooNE NOvA MINOS Near Detector 600m – Far Detector
4
Near Detector Site Location 16SEP14S. Dixon | Conventional Facilities Update4 Looking North - September 2007
5
Near Detector Site Location 16SEP14S. Dixon | Conventional Facilities Update5 Looking South - September 2007
6
Aerial View from West 16SEP14S. Dixon | Conventional Facilities Update6 In Progress Preview
7
Aerial View from West 16SEP14S. Dixon | Conventional Facilities Update7 In Progress Preview MI-12 MicroBooNE MINOS Service Building NOvA Surface Building MiniBooNE Detector SBN Far Detector Building SBN Near Detector Building View Looking Southwest
8
Near Detector - Requirements 16SEP14S. Dixon | Conventional Facilities Update8 From D. Montanari 129m3 Version 231m3 Version
9
Design/Cost Estimate Process – Target: $3.5m July 2014 Design Refined – 2 designs at 2 locations August 2014 - External Estimate –129m3 Version - $4.3m (total project cost) –231m3 Version - $5.1m (total project cost) Scope Reductions – focused on 129m3 version –Eliminated additional loading dock bay –Removed toilets/utilities –Removed cryostat concrete –Reduced siding cost –Onsite disposal of excess spoils –Moved overhead crane from Base Scope to Scope Contingency August 2014 - External Estimate - $3.5m (total project cost) 16SEP14S. Dixon | Conventional Facilities Update9
10
Near Detector Building 16SEP14S. Dixon | Conventional Facilities Update10 Wetland Delineation – June 2014 Plan at Detector Level
11
Near Detector Building 16SEP14S. Dixon | Conventional Facilities Update11 Plan at Grade Level
12
Near Detector Building 16SEP14S. Dixon | Conventional Facilities Update12 Section
13
Near Detector Building 16SEP14S. Dixon | Conventional Facilities Update13 Wetland Delineation – June 2014 Section
14
Near Detector Building – Potential Changes 16SEP14S. Dixon | Conventional Facilities Update14 Overhead Crane Base scope does not include the crane, only the structure capable of supporting a crane; Recognize that a crane is needed for installation; Cost for 10 ton crane is ~$140k Project Plan (section 2.1 on page 12) identifies the crane as one of the highest priorities;
15
Near Detector Building – Potential Changes Reduced Size of Lower Level 16SEP14S. Dixon | Conventional Facilities Update15
16
Near Detector Building – Potential Changes 16SEP14S. Dixon | Conventional Facilities Update16 Shielding - #1 Move enclosure north of SciBoone by ~10 feet;
17
Near Detector Building – Potential Changes 16SEP14S. Dixon | Conventional Facilities Update17 Shielding - #2 Be able to accommodate 9 feet of shielding above the detector; Current Span (30’-8”) is longer than standard shield blocks 24’ “G” Block = 22’ clear * 30’ “N” Block = 28’ clear ** Revised Ledge Raise ground level Larger crane * Standard Fermilab Block, but availability uncertain/unlikely (7.7 tons) ** Non-standard Fermilab Block (9.7 tons)
18
What’s Next Project Plan (SBN-doc-72) Issued for Comment and Compliance Review Revise document based on comments Ready to submit for FY15 funding in October 2014 Subsurface Investigation Soil boring to confirm the soil conditions Final Design Develop an request for proposal for an AE firm Start Final Design in Spring 2015 (based on construction funding in FY2016 – October 2015) 16SEP14S. Dixon | Conventional Facilities Update18
19
Questions 16SEP14S. Dixon | Conventional Facilities Update19