Download presentation
Presentation is loading. Please wait.
Published byEmery Wheeler Modified over 8 years ago
1
District 6
3
Workload Beyond Normal Program Accelerated Project Schedules Additional Funding Technical Expertise Not Available In Department Staff Augmentation Public Involvement Expertise (Neutral Party)
4
Preliminary and Final Design Resurfacing w/ Culvert ReplacementsBridge Design InterchangesBridge Survey Sheets/Geometric Layouts Rural & Urban Highway Reconstruction Bike, Ped & ADA RoundaboutsEnvironmental Documents (CATEX, EA, EIS) Public Involvement Technical Studies Bridge Rehab StudiesFlood Studies Traffic StudiesPlanning Studies Other Project Support Material TestingRight-of-Way Acquisition SurveyingSubsurface Utility Engineering (SUE) Construction Inspection/Administration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.