Presentation is loading. Please wait.

Presentation is loading. Please wait.

District 6.  Workload Beyond Normal Program  Accelerated Project Schedules  Additional Funding  Technical Expertise Not Available In Department.

Similar presentations


Presentation on theme: "District 6.  Workload Beyond Normal Program  Accelerated Project Schedules  Additional Funding  Technical Expertise Not Available In Department."— Presentation transcript:

1 District 6

2

3  Workload Beyond Normal Program  Accelerated Project Schedules  Additional Funding  Technical Expertise Not Available In Department  Staff Augmentation  Public Involvement Expertise (Neutral Party)

4  Preliminary and Final Design Resurfacing w/ Culvert ReplacementsBridge Design InterchangesBridge Survey Sheets/Geometric Layouts Rural & Urban Highway Reconstruction Bike, Ped & ADA RoundaboutsEnvironmental Documents (CATEX, EA, EIS) Public Involvement  Technical Studies Bridge Rehab StudiesFlood Studies Traffic StudiesPlanning Studies  Other Project Support Material TestingRight-of-Way Acquisition SurveyingSubsurface Utility Engineering (SUE) Construction Inspection/Administration


Download ppt "District 6.  Workload Beyond Normal Program  Accelerated Project Schedules  Additional Funding  Technical Expertise Not Available In Department."

Similar presentations


Ads by Google