Download presentation
Presentation is loading. Please wait.
Published byPeter Morgan Modified over 8 years ago
1
Chart Assistant Based upon collected process metrics data determines whether process is in control using statistical methods
2
Chart Assistant On one chart plot –User’s data point –Mean (Am) –Upper and lower natural limits (UNPL and LNPL) –+1 and -1 standard deviations
3
Chart Assistant On the second chart plot –Differences between consecutive data points –Mean (mR) –Upper control limit (UCL)
4
Chart Assistant Process is out of control, if the following is true –single metrics values lies outside UCL –single metrics values lies outside UNPL and LNPL –2 out of 3 consecutive metrics values lie more than 2 std. deviations away from Am –4 out of 5 consecutive metrics values lie more than 1 std. deviation away from Am –8 consecutive metrics values lie on one side of Am
5
Chart Assistant Chart plotted screen no data points entered data points entered change data no data entered enter data plot chart remove all data
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.