1 6 DIMENSIONAL APPROACH TO CONSTRUCTION 2nd floor, S&R Building, Soonora Church 1st Cross Road, Elamkulam, Kochi 20, Kerala, India www.sandrconsultants.com www.aadspro.com Empowering engineering BY REJI ZACHARAIAH

2 www.aadspro.com Aadspro ERP

3 Engineering www.aadspro.com

4

5 Slab design www.aadspro.com

6 Slab detailing www.aadspro.com

7 Slab detailing www.aadspro.com

8 Slab bbs www.aadspro.com

9 Beam design www.aadspro.com

10 Beam detailing www.aadspro.com

11 Beam bbs www.aadspro.com

12 Advantage of BBS  Scheduling and proper bending is strongly recommended for Fe 500. Fe 500 saves 10% compared to Fe 415 steel used presently.  Cutting and bending in a cut and bend factory avoids the wastage completely (5-7 %). With BBS, bars can be cut with planning to reduce the wastage in a site with even the present setup.  There is a general tendency to group slabs and beams in the usual design methods. www.aadspro.com

13  Better quality control at site.  Better estimation of steel.  Real time estimation data, with the design.  Better control on stock of steel actually required.  Theft and pilferage of steel can be reduced.  Economical order quantity for better project management  Bench marking quantity and quality requirements.  Optimize your design based on the quantity of steel. www.aadspro.com

14  Steel bending and cutting can commence even before the form work is done.  Steel bending can be done at a separate site, marked and then can be assembled at site, if there is space limitations.  Project time can be reduced as the bars can be cut and bend before form work is done.  What you see in the drawing is what you get at the site. www.aadspro.com

15  With a quality data set, other management softwares can work on it.  A paper less office concept in the construction industry and associated advantages.  Total length of bars calculated using Engineering formula, leaves nothing to approximation.  Mechanization of bending and cutting is possible. (Cut and bend systems) Reduces labour and time but increases the reliability. www.aadspro.com

16 Column design www.aadspro.com

17 Column detailing www.aadspro.com

18 Footing design www.aadspro.com

19 Footing detailing www.aadspro.com

20 Pile detailing www.aadspro.com

21 Load Data Methodology

22 www.aadspro.com Optimax

23 Import BBS data www.aadspro.com

24 Client Details

25 Create Bar Sequences www.aadspro.com

26 Output www.aadspro.com

27 Estimation- EstimaX www.aadspro.com

28 EstimaX www.aadspro.com

29 Rate Analysis www.aadspro.com

30 Scan Slab Details from CAD Drawing

31 www.aadspro.com

32

33 Generate Estimation www.aadspro.com

34 Export Estimation Quantities to MS Excel or import estimation file in aadspro erp www.aadspro.com

35 Planning www.aadspro.com

36 Project scheduling using aadspro erp www.aadspro.com

37 1. Creating a new project From menu select – masters – work flow - add / edit project www.aadspro.com

38 Adding project details Add Project details & Save www.aadspro.com

39 2. Creating levels in project From Menu select – Masters – Work Flow - Add / Edit Level www.aadspro.com

40 Creating levels Add Level Name & Click Create www.aadspro.com

41 3. Creating tasks in project From Menu select – Masters – Work Flow - Add / Edit Task www.aadspro.com

42 Creating tasks Add Task Details & Click Create www.aadspro.com

43 4. Adding levels in project www.aadspro.com From Menu select – Masters – Work Flow - Add / Edit Levels in project

44 Adding levels in project Select Project – Click Add levels & Select Levels – Click Create www.aadspro.com

45 5. Adding tasks in project From Menu select – Masters – Work Flow - Add / Edit Tasks in project www.aadspro.com

46 Adding tasks in project Select Project – Select Levels – Click Add tasks & Select Tasks – Click Save www.aadspro.com

47 6. Scheduling activities in Gantt chart From Menu select – Masters – Work Flow – Schedule Activities in Gantt Chart www.aadspro.com

48 Scheduling activities in Gantt chart www.aadspro.com

49 7. Exporting activities in Gantt chart to ms project A. Download & install MS project File Generator from Menu – Downloads - MS project File Generator B. Click Export Icon to download the Gantt chart C. Use MS Project File generator to convert downloaded file to MS Project A B C www.aadspro.com D. MS Project file created D

50 www.aadspro.com From Menu select – Masters – Work Flow – Upload Estimax File 8. Importing activities and resources from Extimax (.estx) File

51 Inventory Module www.aadspro.com

52

53 Planning Consumption Stock Resource Purchase Accounts Data Flow www.aadspro.com

54 Resource Category www.aadspro.com

55 Resource Location www.aadspro.com

56 Resource Item www.aadspro.com

57 Project Resources To add resource details for each task in a project www.aadspro.com

58 Physical Stock To update stock of resources at specified location www.aadspro.com

59 Resource Consumption To provide consumed quantity of each resource for a task www.aadspro.com

60 Stock Transfer Transfer resources from one location to another location www.aadspro.com

61 Resource Requirement Schedule Get a list of task to be completed in a specified period Get resource data required for each task Create a purchase order based on requirements www.aadspro.com

62 Resource Requirement Schedule www.aadspro.com

63 Purchase www.aadspro.com

64 Reports Resource Requirement Report Stork Register based on each location. Consumption. Purchase Reports Transfer And more ……. www.aadspro.com

65 Quality Control www.aadspro.com

66 Concrete Pre-Placement Inspection www.aadspro.com

67 Dewatering At Site www.aadspro.com

68 General Information on RCC Site Practice www.aadspro.com

69 Pile-During Casting Report www.aadspro.com

70 Post Formwork False work removal Checklist www.aadspro.com

71 Accounts www.aadspro.com

72 Accounts Groups www.aadspro.com

73 Chart of Accounts www.aadspro.com

74 Cash payments www.aadspro.com Cash Receipts

75 www.aadspro.com Bank payments Bank Receipts

76 Journal Entries www.aadspro.com Contra Entries

77 Accounting Reports www.aadspro.com Cash book Bank book Day book Ledgers Cash Flow Trial Balance Profit and loss account

78 HR Management www.aadspro.com

79 Employee Details

80 Leave Management www.aadspro.com

81 Integrate with punching machines www.aadspro.com

82 Salary and Wage Calculations www.aadspro.com

83 Geotechnical www.aadspro.com

84 Lateral Load

85 Reports

86 Axial Load

87 Footing

88

89

90 Thank You www.aadspro.com For more info Visit www.aadspro.com


Download ppt "6 DIMENSIONAL APPROACH TO CONSTRUCTION 2nd floor, S&R Building, Soonora Church 1st Cross Road, Elamkulam, Kochi 20, Kerala, India www.sandrconsultants.com."