Presentation is loading. Please wait.

Presentation is loading. Please wait.

Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : 130620106006 Sub: surveying.

Similar presentations


Presentation on theme: "Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : 130620106006 Sub: surveying."— Presentation transcript:

1 Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : 130620106006 Sub: surveying

2 Civil Engineering Surveying Adapted from: Roy Frank

3 Planning A Survey  Planning requires a well rounded understanding of surveying practices  Process: 1.Choice of accuracy required (depends on use to be made) 1.Basic Control 2.Topographic 3.Photogrammetry

4 Planning A Survey 2.Existing Control 1.Search records for existing control in area 1.Illinois Geological Survey – Urbana, IL 2.National Geodetic Survey – Rolla, MO or Rockville, Maryland 3.Reconnaissance: 1.Search Procedure: 1.Description often dated 2.Can use GPS receiver (Lat. And Long) 3.Probe, detectors – often problems - brass

5 Planning A Survey 4.Choice of Instruments and Methods 1.Depends on availability, location, existing features, and accuracy 5.Computation and Drafting

6 Accuracy and Errors  Accuracy depends on: 1.Precise instruments 2.Precise Methods 3.Good Planning  Example: Angle turned with theodolite, pointed with care; readings checked thus good precision. Angle’s of 2-3” expected, real results angle’s 15” = accuracy

7 Hydrographic Surveys 1. Surveys and mapping of bodies of water and shorelines 2. Rivers and Lakes – Process different 2.Rivers 2.Normal process is to establish 2 parallel lines of control points on opposite sides 3.River Portion: 2 processes 2.EDM similar to radial 3.Dual instrument with position by angle and intersection 3.Lakes 2.Normal process same as river but generally do not have current problems

8 Topographic Surveys  Scale – Photo  S = (f/H’)  Coordinates From Photos  XA = (xa/f)(H-ha)  YA = (ya/f)(H-ha)  Height of an object  r = radial dist. to top  d = radial dist. to top – radial dist. to bottom h= d (H’) / r h= d (H’) / r

9 Mapping and Map Drafting  2 Basic Types of Maps used in Engineering 1.Line Drawing 2.Photogrametrically prepared manuscript or orthophoto map

10 Mapping and Map Drafting  Factors that influence choice of map scale 1.Clarity with which features can be shown 2.Cost (larger scale – higher cost) 3.Correlation of Map data with related maps 4.Desired size of map sheet 5.Physical factors (number and character), nature of terrain, required contour interval

11 Earthwork Computations by Average End Area Prepare Cross Sections Differentiate between existing & proposed Differentiate between existing & proposed Planimeter Cross Sections Amount of cut & fill for each cross section Amount of cut & fill for each cross section Beginning and end stations have 0 value Beginning and end stations have 0 value Compute Volume Conversion Constant: 1.852 = (100/27)/ 2 = {(Sta. Dist.)/ [CF/CY]} / 2 Conversion Constant: 1.852 = (100/27)/ 2 = {(Sta. Dist.)/ [CF/CY]} / 2

12 SAMPLE END AREA STATION SUM SUM CUT FILLCUT FILL D/100 CUT FILL CUT FILL CUT FILLCUT FILL D/100 CUT FILL CUT FILL 0+00 0 0 0+00 0 0 10 156 1.0 10 156 10 156 10 156 1.0 10 156 10 156 1+00 10 156 1+00 10 156 60 951 1.6 96 1522 106 1678 60 951 1.6 96 1522 106 1678 2+60 50 795 2+60 50 795 247 2321 0.4 99 929 205 2607 247 2321 0.4 99 929 205 2607 3+00 197 1526 3+00 197 1526 202 1636 1.8 364 2945 569 5552 202 1636 1.8 364 2945 569 5552 4+80 5 110 4+80 5 110 5 110 0.2 1 22 570 5574 5 110 0.2 1 22 570 5574 CUT: 570 X 1.852 = 1056 Cubic Yards EMBANKMENT: 5574 X 1.852 = 10324 Cubic Yards Compaction Factor = 25%, 10324 CY X 1.25 = 12905 CY Fill Compaction Factor = 25%, 10324 CY X 1.25 = 12905 CY Fill

13

14 Municipal Surveys 1. Control Monuments and Associated Maps 1.Value: used by planners, engineers, architects, utilities, and surveyors 2. Planning Maps 3. Steps of Fieldwork 1.Establish Network of Major Control Mon. 2.Run traverse connecting major control points 3.Run levels and establish BM’s along traverse network

15 Order for project Monuments: Iron pin with bronze cap in 12’ dia PCC and extending min 18” below frost line (min 48”) Monuments: Iron pin with bronze cap in 12’ dia PCC and extending min 18” below frost line (min 48”) Traverse: 1 st order (1:200,000 – 1:500,000) Traverse: 1 st order (1:200,000 – 1:500,000) –Stations generally 1000’ – 1500’ apart Leveling: base on NGS datum Leveling: base on NGS datum –3-wire differential most often used –Avoid objects that are not permanent (fire hydrants, power poles, etc.)

16 Products: 1. Base Map – shows all control station, traverse stations, BM’s, Streets, ROW, and Public Property 2. Topo Map 3. City Property Survey (location of all existing monuments) 4. Underground Map (utility map)

17 Basic Route Survey and Design * Construction surveys * Construction surveys 1.Reference PI, PT, PC 2.Slope stake for rough grade 3.Stake drainage and structures 4.Layout roadway items 5.BlueTop for subgrade of final grade 6.Progress measurements and cross sections for pay quantities 7.As built surveys

18 Sewer Projects 1. Firm under contract 2. Preliminary studies 1.General layout map 2.Buildings located on general layout 3.Treatment site search 4.Preliminary paper layout 1.Make sure every building and potential building site can be served 2.Manhole system placed on general layout

19 Sewer Projects 5.Preliminary filed work 1.Preliminary profiles 1.BM system established 2.Manholes set 3.Profiles run 4.Basement elevations acquired 2.Design mapping 1.Final plans 3.Treatment area 4.Boundary survey 5.Complete topo of area

20 Sewer Projects 3. Design process 1.Sewer line design 1.Preliminary profiles drawn 1.Basement elevations plotted 2.Manholes placed on profiles 3.Slope between manholes computed 4.Problem areas – alternate service routes selected 1.Manholes set in field 2.Profiles run 3.Revert to 3A

21 Architectural Projects 2.Topo – grid method most common 1.Grid pattern 25’ – 100’ 2.BM – USGS 3.Entire tract topo and adjacent areas to access 4.Utilities – nearest tied in 5.Include all objects above, on or below, ground 6.Prepare topo map 7.Field check map

22 Structure and Terrain Movement Used to monitor: Used to monitor: 1.Movement of buildings ( x, y, and z) 2.Movement of bridges 3.Movement of dams 4.Landslides and earthquakes 5.Amusement park rides

23 Structure and Terrain Movement Equipment: Equipment: 1.GPS 2.Turned angles 3.Angle/Distance 4.Leveling

24 Thank you Thank you


Download ppt "Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : 130620106006 Sub: surveying."

Similar presentations


Ads by Google