Presentation is loading. Please wait.

Presentation is loading. Please wait.

2012 Lead Workshop Healthy Homes Section August 2, 2012 Compliance Bits and Pieces Jim Copeland 517-241-6486.

Similar presentations


Presentation on theme: "2012 Lead Workshop Healthy Homes Section August 2, 2012 Compliance Bits and Pieces Jim Copeland 517-241-6486."— Presentation transcript:

1 2012 Lead Workshop Healthy Homes Section August 2, 2012 Compliance Bits and Pieces Jim Copeland copelandj3@michigan.gov 517-241-6486

2 2012 Lead Workshop Healthy Homes Section 2

3 2012 Lead Workshop Healthy Homes Section Did You Know….. A lead abatement supervisor is required for all set up and clean up activities for interim control work when a child with an EBL has been identified (R325.99406(4).

4 2012 Lead Workshop Healthy Homes Section Did You Know….. The Protect Your family From Lead in Your Home pamphlet is still required for the real estate disclosure requirements at the time of sale or lease of a home. The Renovate Right pamphlet is required prior to conducting renovation activities.

5 2012 Lead Workshop Healthy Homes Section Did You Know….. A failed window trough clearance sample represents all window troughs in the work area that were not tested.

6 2012 Lead Workshop Healthy Homes Section

7 2012 Lead Workshop Healthy Homes Section

8 2012 Lead Workshop Healthy Homes Section Did You Know….. HHS offers a compliance assist program to contractors and all certified lead professionals. The compliance assist must be requested by the lead professional or company. There is no risk of enforcement action with the program. The program is a good educational tool with real world applications.

9 2012 Lead Workshop Healthy Homes Section

10 2012 Lead Workshop Healthy Homes Section

11 2012 Lead Workshop Healthy Homes Section

12 2012 Lead Workshop Healthy Homes Section

13 2012 Lead Workshop Healthy Homes Section Did You Know….. A lead abatement site, once set up, is an abatement site until a passing clearance is achieved.

14 2012 Lead Workshop Healthy Homes Section

15 2012 Lead Workshop Healthy Homes Section

16 2012 Lead Workshop Healthy Homes Section

17 2012 Lead Workshop Healthy Homes Section Did You Know….. Caution tape and signs must remain up until a passing clearance is achieved. Caution tape should be erected creating a 20 foot perimeter around the exterior work area when 20 feet is available. Caution signs should be posted at all entrance points to the work area and at the caution tape for exterior work areas.

18 2012 Lead Workshop Healthy Homes Section

19 2012 Lead Workshop Healthy Homes Section

20 2012 Lead Workshop Healthy Homes Section

21 2012 Lead Workshop Healthy Homes Section

22 2012 Lead Workshop Healthy Homes Section

23 2012 Lead Workshop Healthy Homes Section

24 2012 Lead Workshop Healthy Homes Section

25 2012 Lead Workshop Healthy Homes Section


Download ppt "2012 Lead Workshop Healthy Homes Section August 2, 2012 Compliance Bits and Pieces Jim Copeland 517-241-6486."

Similar presentations


Ads by Google