PROPOSAL RELIEF WELL DESIGN UNTUK MENGHENTIKAN SEMBURAN LUMPUR SUMUR BANJAR PANJI #1 PORONG – SIDOARJO Oleh: IATMI Drilling Team.

Similar presentations


Presentation on theme: "PROPOSAL RELIEF WELL DESIGN UNTUK MENGHENTIKAN SEMBURAN LUMPUR SUMUR BANJAR PANJI #1 PORONG – SIDOARJO Oleh: IATMI Drilling Team."— Presentation transcript:

1 PROPOSAL RELIEF WELL DESIGN UNTUK MENGHENTIKAN SEMBURAN LUMPUR LAPINDO @ SUMUR BANJAR PANJI #1 PORONG – SIDOARJO Oleh: IATMI Drilling Team

2 RELIEF WELL DESIGN BASIC CONCEPT AT LEAST 3 RELIEF WELLS PROPOSED TO ENSURE 2 OF THEM HIT THE TARGETS SELECTED WELL SURFACE LOCATIONS: –FAR AWAY FROM NEARBY HOUSES & PUBLIC ACTIVITIES –FIRM & STABLE TOP SOIL @ SURFACE –EASY ACCESS FOR LOGISTIC SUPPORTS –SUFFICIENT SPACE FOR DRILLING RIG COMPLEX & ITS EQUIPMENT CONFIRMED BOTTOM HOLE TARGETS: –BJP #1 WELL DATA VALIDITY CONSERVATIVE CASING DESIGN TO SECURE THE UPPER HOLE SECTIONS AND TO ENSURE WE CAN REACH THE BOTTOM HOLE TARGET –BJP #1 WELL & OFFSET WELLS DATA –ADDITIONAL DATA ACQUISITION (INCL. 3D SEISMIC & SHALLOW HAZARD SURVEY –“BIG” CASING ON BOTTOM (9-5/8” ??) TO ENSURE HIGH RATE PUMPING CAPABILITY –ALL AVAILABLE DRILLING TECHNOLOGY POSSIBLE UTILIZATION

3 POTENTIAL CHALLENGES EXISTING SURFACE & SUB-SURFACE DATA AVAILABILITY & VALIDITY UNCERTAIN SUB-SURFACE LATEST CONDITION UNCERTAIN BOTTOM HOLE TARGET LOCATION HAZARDOUS WORKING ENVIRONMENT (GAS, SUBSIDENCE, ETC) HIGH FLOW RATE OF FORMATION WATER BLOW-OUT ESTIMATED DRILLING COSTS = $ 200 MM FOR 3 WELLS NOTE: NON-TECHNICAL CHALLENGES WILL BE DISCUSSED AND HANDLED SEPARATELY

4 5 Januari 2008 NEED LATEST AERIAL SHOTS / PHOTO SITE SURVEYS

5

6 PREDICTED SOURCE OF FORMATION WATER BLOW- OUT IS BELOW 6000 FT BOTTOM HOLE TARGET @ 8000 FT WITH 59 deg OF INCLINATION & 9000 FT OF VERTICAL SECTION

7 BOTTOM HOLE TARGET @ 9000 FT WITH 54 Deg OF INCLINATION & 9000 FT OF VERTICAL SECTION

8 KILLING PHASE 15,000 Bbls @ 22 ppg 160 bpm  94 minutes (Eq. 230.400 bpd) 48,800 Bbls @ 12,5 ppg (Eq. 750.000 bpd) 62,800 Bbls @ 15 ppg (Eq. 980.400 bpd) THESE FIGURES WILL BE VERIFIED BASED ON LATEST CONDITIONS.