The Millennium Bridge London
2
Background It is located between Southwark Bridge and Blackfriars Bridge. 1 st Bridge to be built over the river Thames in over 100 years (1894) Construction started in 1998 Construction ended 10 th June 2000 2 days after opening the bridge was closed for modification due to heavy swaying The Bridge was nicknamed the “Wobbly Bridge”
3
Bridge Design Price Construction: £18mConstruction: £18m Modifications: £5mModifications: £5m Total cost: £23mTotal cost: £23m Dimensions: Length: 330mLength: 330m Width: 4mWidth: 4m Height above river at high tide: 10.8mHeight above river at high tide: 10.8m Handrail height: 1.2mHandrail height: 1.2m Materials Used: Piers: Concrete and steel Cables: 120mm locked coil Decking: Aluminium Handrail: Bead blast stainless steel
4
What went Wrong The bridge's movements were caused by a 'positive biofeedback' phenomenon Slight horizontal force from walking on Bridge. More people walking, more force pedestrians locked into the same rhythm of the bridge, increasing the amplitude of the bridge oscillations The worst of the movement occurred on the central span where the deck was moving by up to 70mm.
5
Solution Turned massed Dampers to absorb vertical and horizonatl movement
6
Solution Engineers constructed a criss-crossed exo-skeleton between the decking and the cable arms. This structure acts as a brace At the centre points of the "x" shaped skeleton there are damping mechanisms to counter lateral movement.