Dublin City Council Fabric Upgrade Programme Shane Hawkshaw Senior Executive Engineer Dublin City Council.

Similar presentations


Presentation on theme: "Dublin City Council Fabric Upgrade Programme Shane Hawkshaw Senior Executive Engineer Dublin City Council."— Presentation transcript:

1 Dublin City Council Fabric Upgrade Programme Shane Hawkshaw Senior Executive Engineer Dublin City Council

2 Phase 1 of the Fabric Upgrade Programme began in June 2013 with funding from the Department of the Environment and Local Government. Phase one of the scheme involved :  Cavity wall fill insulation  300 mm attic, Tank, pipes, insulation  Roof /Wall ventilation  Draught proofing  Lagging jackets

3 YearFabric UpgradeVoidsUnits Completed 2013349375724 201440535944647 201514244101834 Units Completed to Date From a stock of approximately 27,000 Units

4 Typical Example of 244 properties before they underwent Phase 1 of Fabric Upgrade Programme

5 ADDRESSDateBedrooms No.Savingsclaim (%) Kw/m2/yr 1Example End terrace Concrete House04/09/142298 >300 90% MAX € 18500 2 TypeEND TERRACE HOUSE 200-300 90% MAX € 15500 M2 60 Existing BERG 100-200 75% MAX € 11500 Year 1945 Proposed BERC1 50-100 75% MAX € 6000 Current energy value= 453.8 e.svd. p/aTotal Spendpay-back AssessorHeat SourceGAS €1,052.4€6,9277 Step UNITS /m2 Proposed Interventions unit price Revised energy rating Energy saving (kWh/ m 2 /yr) Annual energy saving (kWh/yr) Fuel cost per kWh (€euro) 1 Energy savings per annum (€euro) Capital cost (€euro) 2 Payback period (years) 3 1 1Fit 300mm of ceiling insulation in Attic space17381 F 734368€0.0589€257.28€17.000.07 2 1Fit a 91% efficient gas boiler only (to heating section specification.)1600335 E1 462760€0.0589€162.56€1,600.009.84 3 1Full heating/water controls package (to heating section spec.)1000272 D2 633780€0.0589€222.64€1,000.004.49 4 1Block up the chimney and ensure ventilation is maintained150214 C3 583480€0.0589€204.97€150.000.73 5 64Fit Internal "Breathable" Dry-lining wall insulation65156 C1 583480€0.0589€204.97€4,160.0025.59 €1,052€6,9277 Comments78% efficient existing boiler to be replaced. DWELLING ENERGY UPGRADE RECOMMENDATIONS

6 Improvement of Building Energy Rating by Retrofit and by Year of Construction

7 BEFORE RETROFITTINGAFTER RETROFITTING F C3

8

9 Small Area grouping of BERs from Episcope project (5088 Dublin City Council Dwellings)

10 Area Based Schemes 2013 Druid Court, Ballymun, 22 homes Termon Court, Ballymun, 12 homes Kilbarron Court, Coolock, 48 Senior Citizen units Greendale Court, Kilbarrack, 32 Senior Citizen units New boiler and heating controls, cavity wall / attic insulation and upgraded ventilation. External insulation, new PVC windows and doors, thermostatic controls on the heating system including demand controlled ventilation.

11 Area Based Schemes 2014 Sandyhill Gardens, Ballymun, 56 Senior Citizen units Raheen Park, Ballyfermot, 25 Houses New PVC windows and doors, new boilers and heating controls, external cavity wall and attic insulation. Boilers replaced. Cavity wall fill insulation. 300 mm attic, Tank, pipes, insulation Roof /Wall ventilation, Draught proofing Lagging jackets

12 Area Based Schemes 2015 Ard na Meala, Ballymun. 12 units, Saint Mary's court, East wall. 12 units. Killane Court, East wall. 8 units. Lismeen Grove, Coolock. 25 units. Saint John's Court, Donnycarney. 40 units. Bow Bridge Court, Weaver’s Row, Dominic Street Upper & Lord Edward Street. 46 units Cromcastle Court, Coolock. 128 units New boilers with heating controls fitted. Cavity wall / attic insulation and ventilation upgraded. PVC windows fitted. On Going Projects.

13 Greendale Court Dublin 5

14 The development underwent an energy upgrade in late 2013, consisting of external wall insulation, efficient double glazed windows, and a heating control upgrade enabling thermostatic control for each unit. The building was constructed circa 1978 for Dublin City Council, and consists of 32 no. 1-bed apartments and a day care centre.

15 Energy Conservation Methods (ECM) ECM 1 – Fabric Upgrade The ECM consisted of upgrading the fabric of the building by installing external wall insulation (120mm mineral wool), improving the u-value of the external walls to 0.27 W/m2K. The existing windows were replaced with high efficient double glazed uPVC-framed window units with a u-value of circa 1.4 W/m2K. ECM 2 – Heating control upgrade Heating controls were added to the existing central heating system. Each apartment unit was zoned allowing it to be individually thermostatically controlled by means of a room thermostat. The heating circuit in the roof slab was also disconnected, resulting in both storeys of the building being heated by the pipes in the floor slabs only.

16 Actual Gas Bills: Jan – Dec 2013: €23,158 Jan – Dec 2014: €9,968 Savings: €13,190

17 Cromcastle Court Dublin 5

18 Existing Energy Performance

19 Planned Upgrade  Installation of double glazed uPVC framed windows  New Plantroom equipment  Air to Water heat pumps  Controls c/w Remote Access  Savings: €834,702 over 10 years

20 Challenges Going Forward:  361 units still to complete under Phase 1 of Fabric Upgrade Programme  €1.2M funding required to complete Phase 1  Phase 2 will involve the same upgrade as in Phase 1 with the inclusion of external wall insulation and uPVC windows where required. (approximately 13,000 units)  Funding required to complete Phase 2 - approximately €130M

21 Thank You