PRE-BID MEETING CONSTRUCTION OF MEDUPI BORUTHO 400kV TRANSMISSION LINES PRE-BID MEETING PROJECT MANAGEMENT Presented by: Theo Meveni 13 January 2015
2
2015/01/132 Scope of Work Executive Summary Medupi Borutho 400kV Line, Section A Construction of 84 kms kilometers of Medupi Borutho 400kV Transmission Power Line in the Lephalale area of Limpopo Province. Construction of 2 underpasses first one outside Medupi Power station and the second one 25 km away from Medupi P/S. Medupi Borutho 400kV Line, Section B Construction of 90kms kilometers of Medupi Borutho 400kV Transmission Power Line in the Mokopane area of Limpopo Province.
3
Project Scope of Works The construction need to be done in accordance with Eskom design and specifications. Medupi-Borutho 400kV Line Final Design Report- U.TX201.031-06-002 Rev1 Medupi-Borutho 400kV Transmission Line Specification- U.TX201.031-07- 001 Rev1 Medupi-Borutho 400kV Line Templating Report- U.TX201.031-05-04-001 Rev0 3 2015/01/13
4
Scope of Work Cont…………. 4 The Scope of Work Includes: Access roads and infrastructure Bush clearing Tower foundations and stay wire foundations Fabrication and erection of structural steel transmission towers Installation of hardware, conductor and insulators Tower assembly, stringing and labelling Conductor Regulation The lines run through a predominantly game farming, agricultural land and a villages. 2015/01/13
5
Scheduling Requirements NO REQUIREMENT 1 A3 Hard copy 2Electronic copy (not PDF) must be available 318 Months Duration, assume effective start date (Both Section A and B) 4Durations of the activities 5Critical path 6Resource usage 7 Key milestone dates e.g foundation completion date, tower assemble, erection 8Calendar days including holidays 9Risk Allowance e.g rainfall 52015/01/13