Download presentation
Presentation is loading. Please wait.
Published byPolly Elliott Modified over 8 years ago
1
PROGRESSIVE WATER ENGINEERING PVT. LTD COMPLETE SOLUTION PROVIDER FOR WATER & WASTEWATER TREATMENT ENGINEERING
2
Design engineering consultancy firm for water & wastewater treatment Established in 1997 Professional team of engineers, draftsmen and consultants Completed more than 70 projects from 0.5 MLD to 900 MLD capacity Approved consultant of Bharat Heavy Electricals Ltd. (BHEL) for water & wastewater treatment projects Introduction
3
Water Treatment Plant Sewage Treatment Plant Effluent Treatment Plant Interceptor and microtunelling for sewer line Biogas upgradation through DGC Reactor Large sewage pumping stations Ash water recirculation plant Areas of Experience
4
Customers & Services
5
Project Owner Project Consultant Feasibility study Design Basis Preparation of Specification Tender Evaluation Review of detail drawing by contractor Project Monitoring Assistance in Commissioning & Troubleshooting
6
Turnkey Contractor Tender Preparation Detail Design P&ID, GA, Piping Hydraulic Design, Layout, Operation Manual Customers & Services Preparation of BOQ Purchase Specification for Equipment Assistance in Performance Test Pre- bid engineering Erection & Commissioning Activities
7
Areas of Technical Expertise
8
Water Treatment Clarification Conventional Clarifier Reactor Clarifier Tube SettlerPulsator Clarifier Membrane Process (Reverse Osmosis, Ultrafiltration) Filtration Demineralization Intercepting Chamber and Pumping station for microtunneling Technical Expertise
9
Aerobic Biological Treatment Dissolved Air Floatation for oil removal Sludge Handling by Centrifuge/Belt Press Effluent Treatment Technical Expertise Physical & Chemical Treatment Plate Pack Separator
10
Stabilization Pond Activated Sludge Process Upflow Anaerobic sludge digestor Moving Bed bio reactor Fixed film bio reactor Power generation from biogas Wet land Technical Expertise Sewage Treatment
11
Major Clients
12
Passavant Roediger, Germany Al Ansari, Oman BHEL Delhi Jal Board Jaipur Development Authority, Jaipur DS Construction Ltd., Gurgaon Vishwa Infrastructure & Services Pvt. Ltd., Hyderabad
13
McNally Bharat, Kolkata Degremont, Gurgaon Technofab Engineering Ltd. Faridabad Mott MacDonald, Mumbai Triveni Engineering Ltd., Noida Consulting Engineering Services Ltd., Delhi Lanco Infratech Ltd., Delhi Major Clients
14
Major Projects
15
Project footprint in – India Sultanate of Oman Africa Bangladesh United Kingdom Fiji
16
Contractor – Passavant Roediger, Germany Fast Track Project – Specification prepared by Ford USA. Water and Waste Water Treatment Plant Project comprises of - - D yna Sand Filter for filtration of water - Ultrafiltration unit to remove bacteria and viruses - Membrane Bio Reactor Technology - Chamber Press for sludge processing - Reverse Osmosis process for recycling of water ETP for Ford’s Manufacturing Unit, Gujarat, India
17
6 MLD Sewage Treatment Plant at Barka, Oman Client – Al Ansari, Oman Membrane Bio Reactor technology MBR supplied by GE Water & Process Tech.
18
ADB project Client - Government of Fiji Contractor - Techno Fab Engineering Chief Consultant - Beca Erasito, New Zealand Revamping project to augment the capacity by 35 MLD Bio Gas generation form sludge with anaerobic Digester 35 MLD Sewage Treatment Plant at Fiji
19
Interceptor sewer projects in Delhi, India Client – Delhi Jal Board Consultant – Engineers India Limited Intercepting all open sewage drains and diverting to sewage treatment plant After interception, sewage will be treated to remove grit and floating materials, before feeding to STP Micro Tunneling shall be used to lay pipe below 10 to 12 meters without disturbing the city life
20
900 MLD WTP at Mumbai, India Client – Brihan Mumbai Municipal Corporation Contractor – Degremont India Limited Largest single system WTP in India Pulsator Clarifier system All waste water recycled Sludge Dewatering facility
21
8 MLD Tertiary Treated Sewage as make up water to Jal Mahal Lake, Jaipur, India Client - Jaipur Development Authority Study and design of physico-chemical treatment of secondary treated sewage Design of wetland system for polishing of water
22
Client - Delhi Jal Board 225 MLD Sewage pumping station and 112.5 MLD Sewage Treatment Plant Activated Sludge Process Power Generation through Bio Gas Heating of digester sludge with flue gas from gas engine 112.5 MLD Sewage Treatment Plant at Delhi, India
23
Client – Ideal Energy Power Limited Water pre- treatment plant DM plant CW treatment plant Effluent treatment plant Ash water recirculation plant. 1 x 270 MW Ideal Power Station, Nagpur, India – Water & Wastewater system
24
Client – Mahagenco Contractor – Techpro Ashtek Tube settler/Lamella Clarifier has been used Complete water is recycled for ash handling system 800 m 3 /hr ash water recirculation plant at Bhusawal Thermal Power Station, India
25
630 MLD WTP at Sonia Vihar, Delhi 363 MLD WTP at Indore 90 MLD WTP in Bangladesh WTP for thermal power plants from 100 MW TO 2000 MW. 62.5 MLD STP at Jaipur 160 MLD STP at Nilothi 32 MLD CEPT at Bawana Other Major Past Projects
26
Looking forward to work with you……..
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.