Purpose & Need Continued safe storage of spent fuel onsite Dry storage is preferable over wet storage for retired plants Safe, secure, passive, economical system Current ISFSI nearing full capacity First step toward transfer of fuel offsite 3
4
4 34 States have at least one ISFSI
5
Plant Layout 5
6
6 Proposed Configuration
7
Holtec UMAX System 7 Concrete and Stainless Steel Lid
8
Oct 6, 2015: CCC meeting in Long Beach Nov 2015: Mobilize Construction Jan 2016: Start Construction Aug 2017: Complete Construction Mid-2019: Complete Offload of Fuel 8 ISFSI Project Milestones
9
SONGS co-participants respectfully request CCC approval of the proposed project Proven, safe, passive technology Preferable for retired nuclear plants First step to moving fuel offsite 9 Summary
10
Thank You
11
11
12
12 Onsite Location Alternatives Make-Up Demineralizer Area Reservoir Parking North Industrial Area K-Buildings South Yard
13
SONGS Spent Fuel CURRENT STATE EXPANDED ISFSI Spent Fuel Pools 2668 fuel assemblies To the DOE: 3855 fuel assemblies in 125 canisters FUTURE STATE 75 canisters (2668 fuel assemblies) + existing 50 canisters (1187 fuel assemblies) 13 Existing ISFSI 50 canisters (1187 fuel assemblies)
14
Proposed ISFSI with Existing Conditions 14
15
Proposed ISFSI with Sea Level Rise 2035 15
16
Proposed ISFSI with Sea Level Rise 2051 16
Similar presentations