28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting Originally written for 28 May 2010 Updated 11 June 2010 Reuben Wright, Deimos Space
2
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Schedule Deliverables Work in Progress EO Extension for SPS SFRE Documentation SFRE Development MTR
3
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Schedule 1/2
4
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Schedule 2/2
5
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Documentation Deliverables
6
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Software Deliverables
7
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SPS 2.0 Status WG is currently working on the RFC comments and creating a revised document, which will be ready soon. Next Steps Final decisions on comments at TC After this then there is a last public review phase Need to reach agreement on the identifier concept across all SWE specs Likely to agree on http-URI
8
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SPS Extension for EO Status Drafted throughout Specification Model and ATS updates Next Steps RFC Candidate document this week (expected 11 June) to be added to OGC Pending area and HMA Wiki Adding list of questions/issues to document to help focus reviews Presented for discussion/RFC at next OGC TC (14-18 June) Reviews Some (eg Astrium, Spot, ED) have contributed, but many other parties have not
9
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SPS Extension for EO EO GML 3.2.1 Dependency on EO GML 3.2.1 has been introduced (as per PR “Andrew’s approach is using GML 3.2 except the GML:Observation. Approach to be aligned with approach proposed by Simon Cox which most likely will use the same model-driver-approach.", "It is agreed that GML 3.2 will be used by all tasks." ) Schemas used are Andrew Woolfe’s “Reverse engineered” ones Can you confirm this is correct and if/how/when they will be formally adopted? Reviews of EO Parameters Review by the HMA Architecture Board requested by PGM but no responses Any ideas on how to boost participation during RFC? Could an HMA AWG meeting during RFC be useful?
10
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Requirements Requirements Baseline Documents Version 1.1 Software System Specification (SSS) and Software Requirements Specification (SRS) have been completed Closed all RIDs from PR Submitted on 8 April for approval This is needed for PR closeout and invoicing Any idea on likely schedule? Uploaded to HMA Wiki 23 April Requirements Traceability Being used in Design documentation and Test Planning
11
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Documentation Software Design Document (SDD) Drafted an integrated document for both SF Client and SF Server ECSS 40C has been followed with the following sections not included as they were not deemed relevant for the project: Software dynamic architecture (The SDD shall describe the design choices to cope with the real time constraints (e.g. selection and description of the computational model). Long lifetime software (The SDD shall describe the design choices to cope with the long planned lifetime of the software, in particular minimum dependency on the operating system and the hardware to improve portability.) Memory and CPU budget (The SDD shall document and summarize the allocation of memory and processing time to the software components.) Software components design - General In our case there is no need for a further overview of the components (they are identified in 4.1. Software Static Architecture and 4.2. Software Behaviour) and all details are provided in the individual section for each component.
12
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Documentation Acceptance Test Plan (ATP) Proposal to use Deimos standard template for Acceptance Testing, as used in HMA-T (and many other ESA projects) ECSS 40C does not give detailed guidance (beyond mention in Table A1) A7 from 27/04/2010: Yves Coene to check ECSS 40C to decide what should be done (across all tasks) in the way of Testing documentation Any idea on likely schedule?
13
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: SFRE Development Development progress SF Client work started - progress being made on supporting the v2.0 operations SF Server work continues – generates a valid response for all operations except DescribeSensor. Working on planning simulation Open Source SPS Library Deimos updates committed SPOT updates expected by end of June Open Source Notifications Library to be created by end of June Development process Internal release 2 (the first release with any UI) early June These versions of Client and Server will be tested for interoperability
14
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service Work in Progress: Executable Test Suite CTL Will be used, with a mix of CTL rules, and Schematron, XSLT and Java calls TEAM Engine Official version in Sourceforge “Unofficial” HMA Branch from ERGO Which version have other HMA tasks used? What is our baseline (and what is the chance it will change) version?
15
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service MTR MTR at ESRIN Is the date (5-7 July) and location (ESRIN) confirmed? Software Design Document will be formally released (target date?) Acceptance Test Plan may be, depending on when we know what format to use All ICD documents will be at RFC or beyond