1 INFORMATION SECURITY MANAGEMENT L ECTURE 8: R ISK M ANAGEMENT C ONTROLLING R ISK You got to be careful if you don’t know where you’re going, because you might not get there. – Yogi Berra

2 Introduction To keep up with the competition, organizations must design and create a safe environment in which business processes and procedures can function

3 Qualitative Risk Analysis Evaluate opinions, feelings, ideas Scenarios Brainstorming Delphi technique Storyboarding Focus groups Surveys, questionnaires, checklists One-on-one meetings, interviews

4 Qualitative Risk Assessment For a given scope of assets, identify:  Vulnerabilities  Threats  Threat probability (Low / medium / high)  Impact (Low / medium / high)  Countermeasures

5 Example of Qualitative Risk Assessment ThreatImpactInitial Probability Counter- measure Residual Probability Flood damageHLWater alarmsL TheftHLKey cards, surveillance, guards L Logical intrusion HMIntrusion prevention system L

6 Quantitative Risk Assessment Extension of a qualitative risk assessment. Metrics for each risk are:  Asset value: replacement cost and/or income derived through the use of an asset  Exposure Factor (EF): portion of asset's value lost through a threat (also called impact )  Single Loss Expectancy (SLE) = Asset ($) x EF (%)  Annualized Rate of Occurrence (ARO) Probability of loss in a year, %  Annual Loss Expectancy (ALE) = SLE x ARO

7 Example of Quantitative Risk Assesment Theft of a laptop computer, with the data encrypted Asset value: $4,000 Exposure factor ? SLE, ARO, ALE ?

8 Example of Quantitative Risk Assesment Dropping a laptop computer and breaking the screen Asset value: $4,000 Exposure factor ? SLE, ARO, ALE ?

9 Qualitative vs. Quantitative

10 Documenting the Results of Risk Assessment Goals of the risk management process – To identify information assets and their vulnerabilities – To rank them according to the need for protection In preparing this list, a wealth of factual information about the assets and the threats they face is collected The final summarized document is the ranked vulnerability risk worksheet

11 Risk Control Strategies Choose one of four basic strategies:  Avoidance  Transference  Mitigation  Acceptance

12 Avoidance The risk control strategy that attempts to prevent the exploitation of the vulnerability Examples

13 Transference The control approach that attempts to shift the risk to other assets, other processes, or other organizations Examples

14 Mitigation The control approach that attempts to reduce the damage caused by exploitation of vulnerability Types of Mitigation Plans

15 Acceptance Do nothing to protect an information asset – To accept the loss when it occurs

16 Managing Risk Risk appetite (also known as risk tolerance)

17 Managing Risk – Residual Risk Residual Risk is a combined function of: – Threats, vulnerabilities and assets, less the effects of the safeguards in place

18 Managing Risk – Residual Risk Once a control strategy has been selected and implemented: – The effectiveness of controls should be monitored and measured on an ongoing basis ( remember our discussion on metrics and baselining ) determines effectiveness and accuracy of the residual risk estimate

19 Managing Risk – Risk Control Risk control involves selecting one of the four risk control strategies Should the organization ever accept the risk?

20 Risk Acceptance Source: Course Technology/Cengage Learning Figure 9-2 Risk-handling action points

21 Feasibility and Cost-Benefit Analysis There are a number of ways to determine the advantage or disadvantage of a specific control The primary means are based on the value of the information assets that it is designed to protect Economic feasibility – Evaluating the worth of the information assets to be protected and the loss in value if those information assets are compromised

22 Cost-Benefit Analysis: Cost Factors that affect the cost of a safeguard – Cost of development or acquisition of hardware, software, and services – Training fees – Cost of implementation – Service and maintenance costs

23 Cost-Benefit Analysis: Benefit The value to the organization of using controls to prevent losses associated with a specific vulnerability

24 Cost-Benefit Analysis: Asset Valuation The process of assigning financial value or worth to each information asset Involves estimation of real and perceived costs associated with the design, development, installation, maintenance, protection, recovery, and defense against loss and litigation

25 An organization must be able to place a dollar value on each information asset it owns Potential loss is that which could occur from the exploitation of vulnerability or a threat occurrence Cost-Benefit Analysis: Asset Valuation

26 Cost-Benefit Analysis Calculation CBA determines whether or not a control alternative is worth its associated cost CBAs may be calculated before a control or safeguard is implemented Or calculated after controls have been implemented and have been functioning for a time

27 Cost-Benefit Analysis Calculation CBA = ALE(prior) – ALE(post) – ACS – ALE (prior to control) is the annualized loss expectancy of the risk before the implementation of the control – ALE (post-control) is the ALE examined after the control has been in place for a period of time – ACS is the annual cost of the safeguard

28 Example of Cost-Benefit Analysis Calculation Dropping an iPad and breaking the screen Asset value: $700  Exposure factor: 50%  SLE = ?  ARO = 25% chance of damaging  ALE (prior) = ?  Assume the ARO is reduced to 5% by using control  ALE (post) = ? CBA (cost of case = $30)  CBA = ALE(prior) – ALE(post) – ACS  CBA = ?

29 Example of Cost-Benefit Analysis Calculation Unprotected customer database Asset value: $200,000  Exposure factor: 50%  SLE = ?  ARO = 75% chance of occurring  ALE (prior) = ?  Assume the ARO is reduced to 5% by using control  ALE (post) = ? CBA (ACS = $5,000)  CBA = ALE(prior) – ALE(post) – ACS  CBA = ?

30 Other Methods of Establishing Feasibility Organizational feasibility analysis Operational feasibility Technical feasibility Political feasibility

31 Alternatives to Feasibility Analysis Benchmarking Due care and due diligence Best business practices Gold standard Government recommendations Baseline

32 Risk Management and Employees “Only two things are infinite, the universe and human stupidity, and I’m not sure about the former.” - Albert Einstein Types of Employees and Security Knowledge  Those who know  Those who don’t  Those who think they know but don’t