WP03 Validation Framework Kick-Off Meeting Madrid 7/8 February 2012 Jaime Pérez de Diego

Similar presentations


Presentation on theme: "WP03 Validation Framework Kick-Off Meeting Madrid 7/8 February 2012 Jaime Pérez de Diego"— Presentation transcript:

1 WP03 Validation Framework Kick-Off Meeting Madrid 7/8 February 2012 Jaime Pérez de Diego jpdediego@e-crida.aena.es

2 Index 1.WP3 Objectives 2.WP3 Organization 3.Validation Framework 4.Validation Objectives I.AP2050+ Needs II.Value function III.Common baseline IV.Possible solutions 5.WP3 Strategy 6.Activities and Deliverables 7.Schedule 8.Validation Plan. Spiral life-cycle 9.Actions 10.AOB 2

3 WP3 Objectives 1.Develop a validation framework to increase the maturity Level of the Airport 2050+ concepts from V0 to V1. 2.Enable performance assessment in the following areas: 1.Cost Efficiency 2.Climate Neutral 3.Time Efficiency 3

4 WP3 Organization 3.1 Validation Plan. Establish a validation strategy 3.2 Perform Validation. First cycle Identify the needs Preparation and conduct gaming exercise 3.5 Workshop 3.3 Perform Validation. Second cycle Scope the concepts Extended Queuing Network Model (EQNM) Analytical Model Fast Time Simulation (FTS) 3.4 Validation Integration Results Elaborate the validation report. 4

5 WP3 Organization 5

6 WP3 Organization (Proposal) 6 Time EfficientClimate NeutralCost Efficient 3.1 Validation Plan Leader: CRIDA Contributor: INECO, UPM Leader: CRIDA Contributor: INECO, UPM Leader: CRIDA Contributor: INECO, UPM 3.2 Validation First Cycle Leader: CRIDA Contributor: SLOT, TUD Leader: INECO Contributor: NLR, SLOT Leader: UPM Contributor: CRIDA, SLOT 3.3 Validation Second Cycle Leader: UPM Contributor: DLR, CRIDA Leader: INECO Contributor: NLR, JAREKS Leader: UPM Contributor: DLR, INECO 3.4 Integration Validation Leader: CRIDA Contributor: TUD, JAREKS Leader: CRIDA Contributor: TUD, JAREKS Leader: CRIDA Contributor: TUD, JAREKS 3.5 Second Workshop Leader: CRIDA Contributor: INECO, UPM Leader: CRIDA Contributor: INECO, UPM Leader: CRIDA Contributor: INECO, UPM

7 Validation Framework. 1 st Cycle 7 E-OCVM Concept Validation Establish and quantify the drivers for change Identify Improvement Areas & Objectives Gather Needs Identify the relevant parameters of the value function Identify invariant processes

8 Validation Framework. 2 nd Cycle 8 E-OCVM Concept Validation Identification of operational/technical solutions to cover the needs identified in V0 Establishment of an appropriate performance framework Identification of potential benefit mechanisms Scope of potential applicability Initial Cost Estimates

9 Validation Objectives Identify Needs Reference 2012 Parameters involved Value function Identify the value generators Identify the invariant processes Minimum common baseline Time Efficient, Green, Cost Efficient Big, medium, small Are encountered solutions in line with the initial target? Out of the box Inputs and feedback from WP2 (Objectives, Change Impact Methodology) and WP4 (Concepts, feasibility?, accuracy) 9

10 AP2050+ Needs Airport 2012 as ‘reference point’ 10 Green Time Efficient Cost Efficient

11 Value function 1.Identify the value generators 2.Identify the invariant processes 3.Boundary conditions 4.Weighing methods 5.Objectives and attributes 11

12 Minimum Common Baseline 12 Time Efficient Cost Efficient Green Common Baseline Small Medium Big

13 Possible Solutions 13 TimeCostEnvironment

14 WP3 Validation Strategy 14 WP3 is going to be based on a Spiral Life-Cycle model for the validation of radical and novel concepts and solutions which, hypothetically, could be deployed in 2050+. Thus, these concepts are supposed to be very immature, therefore, conventional validation techniques will not be appropriate. WP1WP6 WP2 WP3 WP4 WP5

15 WP3 Validation Strategy 15 1st Cycle. Validation V02nd Cycle. Validation V1Integration of Validation

16 WP3 Validation Strategy Spiral Life Cycle Model 16 Validation Plan. 1 st Cycle.V0 Validation Plan. 2 nd Cycle. V1 Methodology Framework Conclusions Kick-Off Integration of validation

17 Activities and Deliverables Activities: T3.1 Validation Plan T3.2 Perform Validation. First Cycle –Subtask 3.2.1 First Cycle Validation. Time Efficient Airport –Subtask 3.2.2 First Cycle Validation. Green Airport –Subtask 3.2.3 First Cycle Validation. Cost Efficient Airport T3.3 Perform Validation. Second Cycle –Subtask 3.3.1 Second Cycle Validation. Time Efficient Airport –Subtask 3.3.2 Second Cycle Validation. Green Airport –Subtask 3.3.3 Second Cycle Validation. Cost Efficient Airport T3.4 Integration Validation T3.5 2 nd Workshop Deliverables: D3.1 Validation plan D3.2 Validation report D3.3 Validation workshop report 17

18 WP3: 1 st Cycle WP3: 2 nd Cycle Integration Initial concept Dev Detail concept Dev Initial concept Dev Detail concept Dev Initial concept Dev Detail concept Dev Concept Development Methodology Schedule 18

19 Actions 19 Produce the first version of the Validation Plan draft. Start gathering AP2050+ needs. Design & define the validation exercises for the First Validation Cycle.

20 AOB


Download ppt "WP03 Validation Framework Kick-Off Meeting Madrid 7/8 February 2012 Jaime Pérez de Diego"