Download presentation
Presentation is loading. Please wait.
Published byAugustus Andrews Modified over 8 years ago
1
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne
2
4-9-14 2 CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS at AD&I Parallel Sessions e + Source – Some Adjustments but New Layout will Still Fit into Space Allotted in TDRe + Source – Some Adjustments but New Layout will Still Fit into Space Allotted in TDR Resolution of Timing Issue Will Affect Overall Tunnel Length and Many of the Other Area SystemsResolution of Timing Issue Will Affect Overall Tunnel Length and Many of the Other Area Systems Damping Ring – At this Point, No Adjustments Currently Under Consideration Would Change the Damping Ring Layout (Timing Issue)Damping Ring – At this Point, No Adjustments Currently Under Consideration Would Change the Damping Ring Layout (Timing Issue) BDS – Some Reduction in Tunnel Length May be Gained After Reviewing the Current (RDR ?) LayoutBDS – Some Reduction in Tunnel Length May be Gained After Reviewing the Current (RDR ?) Layout Further CFS Interaction with Area Systems will Continue to Resolve Issues Through Weekly CFS MeetingsFurther CFS Interaction with Area Systems will Continue to Resolve Issues Through Weekly CFS Meetings
3
4-9-14 3 CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS Joint Session with SRF for Cryogenics Talks by T Peterson, H Nakai, T Sanuki and D DelikarisTalks by T Peterson, H Nakai, T Sanuki and D Delikaris Overview of ILC Cryo Needs and RegulationsOverview of ILC Cryo Needs and Regulations Discussions of ILC Helium Capacities and Venting ParametersDiscussions of ILC Helium Capacities and Venting Parameters Overview of CERN Helium Usage and Storage StrategiesOverview of CERN Helium Usage and Storage Strategies Further Work Needed to Develop Helium System Design and Storage StrategiesFurther Work Needed to Develop Helium System Design and Storage Strategies
4
4-9-14 4 CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS Main Linac Shielding Special Session Talks by E Paterson and T SanamiTalks by E Paterson and T Sanami Current “Maximum Credible Accident” Assumption Needs ReviewCurrent “Maximum Credible Accident” Assumption Needs Review Technical Board Needs to Define a Set of Reasonable Accident ParametersTechnical Board Needs to Define a Set of Reasonable Accident Parameters Interaction with Radiation Experts and Regulators Needs to Reach a Reasonable Consensus for the ILC ProjectInteraction with Radiation Experts and Regulators Needs to Reach a Reasonable Consensus for the ILC Project
5
4-9-14 5 CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS Joint Session with MDI/BDS for Beam Commissioning Talks by G White, T Okugi, T Tauchi and Marco OriuinnoTalks by G White, T Okugi, T Tauchi and Marco Oriuinno Description of Several Beam Commissioning StrategiesDescription of Several Beam Commissioning Strategies Initial Accelerator w/No Detector Initial Detector Portions of Final Focus Equipment Conclusion is that All Commissioning will be Below Full Intensity, w/o Detector Hall Occupancy and No Shielding Wall will be RequiredConclusion is that All Commissioning will be Below Full Intensity, w/o Detector Hall Occupancy and No Shielding Wall will be Required
6
4-9-14 6 CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 3 CFS Joint Sessions with MDI and Detectors Talks by Y NishimotoTalks by Y Nishimoto Status of Baseline and Hybrid Asian Detector Hall Civil Design and ScheduleStatus of Baseline and Hybrid Asian Detector Hall Civil Design and Schedule Review of Heavy Equipment Transportation ExamplesReview of Heavy Equipment Transportation Examples Discussion Suggested Adjustments for Hybrid Access Alternative will be Reviewed for Cost and Schedule ImpactDiscussion Suggested Adjustments for Hybrid Access Alternative will be Reviewed for Cost and Schedule Impact T Sanuki will Lead an Investigation to Identify Optimum Detector Component Weight Restriction with Respect to Road Capacity, Preferred Route and Bridge Reinforcement RequirementsT Sanuki will Lead an Investigation to Identify Optimum Detector Component Weight Restriction with Respect to Road Capacity, Preferred Route and Bridge Reinforcement Requirements
7
4-9-14 7 CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 3 CFS Joint Sessions with MDI and Detectors cont. Talks by K Buesser and M OriunnoTalks by K Buesser and M Oriunno Review of Basic Components for Both ILD and SiD DetectorsReview of Basic Components for Both ILD and SiD Detectors Review of Proposed Assembly Strategies for Both ILD and SiD DetectorsReview of Proposed Assembly Strategies for Both ILD and SiD Detectors General Discussion Regarding Optimization of Hybrid Alternative for Detector Hall AccessGeneral Discussion Regarding Optimization of Hybrid Alternative for Detector Hall Access
8
4-9-14 8 CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS Joint Session with e- and e+ Sources Talks by W Gei and T OmoriTalks by W Gei and T Omori Review and Discussion of Positron Source Space Requirements and Target StorageReview and Discussion of Positron Source Space Requirements and Target Storage Review of Conventional e+ SourceReview of Conventional e+ Source Also General Discussion Regarding Auxiliary SourceAlso General Discussion Regarding Auxiliary Source
9
4-9-14 9 CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Other CFS Parallel Sessions The Asian Pre- Construction Planning and Schedule were Reviewed and DiscussedThe Asian Pre- Construction Planning and Schedule were Reviewed and Discussed More Detailed Cost and Manpower Estimates were Also Reviewed and Discussed for the Pre- Construction TasksMore Detailed Cost and Manpower Estimates were Also Reviewed and Discussed for the Pre- Construction Tasks Two Parallel Sessions were Devoted to Presentations and Discussions Regarding the Various Non- Experimental Functions of the KEK, DESY, CERN and FNAL Laboratories to Provide Input for the Planning of the ILC LaboratoryTwo Parallel Sessions were Devoted to Presentations and Discussions Regarding the Various Non- Experimental Functions of the KEK, DESY, CERN and FNAL Laboratories to Provide Input for the Planning of the ILC Laboratory
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.