Download presentation
Presentation is loading. Please wait.
Published byDaniella Higgins Modified over 8 years ago
1
Updating Statistical maps with GPS
2
Global Positioning System Space segment Control segment Users Segment
3
GPS Satellites Name: NAVSTAR Manufacturer: Rockwell International Altitude: 10,900 nautical miles Weight: 1900 lbs (in orbit) Size:17 ft with solar panels extended Orbital Period: 12 hours Orbital Plane: 55 degrees to equatorial plane Planned Lifespan: 7.5 years Current constellation: 24 Block II production satellites Future satellites: 21 Block IIrs developed by Martin Marietta Space segment
5
Users Segment
7
Projection
10
Errors: Atmospheric error Clock & Orbit Error Multi path Error S.A. (Selective Availability) A.S. (Anti Spoofing) DOP(Dilution Of Precision)
11
Differential GPS
12
Positioning Methods: Static method Kinematic method Stop & Go method
13
Choosing suitable receiver:
14
Updating Statistical maps with GPS 1- Rural Maps (Scale 1:50000) 2-Urban Maps (scale 1:2000)
15
مرغداري حيدري Rural Maps:
16
Updating Roads:
17
Urban Maps:
27
Problems: in the urban areas the high buildings and trees were caused cycle slip and slowness the work.
28
Result: updating the urban and rural maps of 2 provinces.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.