2 Inventory Management in the Supply Chain Motivation for Good Performance The Basic EOQ Model Statistical Methods Monte Carlo Simulation Method
3
3
4
Source: Brown, M., Inventory Optimization: Show Me the Money, Supply Chain Management Review, July 2011.
5
5 Tier 1 Suppliers Manufacturer Distributor RetailerCustomer
6
6
7
7 Source: Weltman example slide 18, calculation of safety stock when demand and lead time vary.
8
8 How much When ddlt
9
9
10
10
11
11 Hard Drive Annual Demand = 25,000 Lead Time = 7 days Demand During Lead Time = (25,000 / 365) X L = 480 Cost = $128 per drive H = 25% of unit cost per year S = $1000 per order
12
12
13
13
14
14 L=7d Inventory Position Day R=480
15
15 Inventory Position Day R=?
16
16 Inventory Position Day R=?
17
17
18
18 Hard Drive Annual Demand = 25,000 Lead Time = 7 days Demand rate = 68.5 days, normally distributed with s.d. of 40 days Cost = $128 per drive H = 25% of unit cost per year S = $1000 per order 95% Service Level
19
19 Sources: Eppen, G.D., & Martin, R.K. (1988). Determining safety stock in the presence of stochastic lead time and demand. Management Science, 34(11), 1380-1390. Hadley, G., & Whitin, T.M., Analysis of Inventory Systems, Printice Hall, Englewood Cliffs, NJ, 1963.
20
20
21
21
22
22 Simulation refers to an analytical method of repeated, random sampling, meant to approximate the behavior of a real-life system, especially when other methods are too, costly or difficult to reproduce.
23
23 Mean daily demand68.5 Standard deviation40 Daily Demand - Simulation74.98 Lead Time7 demand during lead time524.86
24
24
25
25
26
26
27
27 What has been your smallest, largest, and most likely daily demands for the hard drive?