Download presentation
Presentation is loading. Please wait.
Published byJasmin McDonald Modified over 8 years ago
1
WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S., ETHz RAVAT S., CERN RIGAUT Y., CERN VIANT T., ETHz EP Status & Plans for WA105 Control System DELEGLISE G., LAPP DUCHESNEAU D., LAPP GEFFROY N., LAPP KARYOTAKIS Y., LAPP 1
2
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Meeting Topics -Slow Control system -Status and plan of detector cabling -Racks Status -PVSS & Communication with other system -CRP Control system status -Planning for the two next months 2
3
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP SLOW CONTROL SYSTEM 3
4
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Slow control system recap Technical Network PVSS DATA SERVER CERN Network ethernet WA105-PC01 WA105-PC02 ETHERNET Oracle Server ETHERNET Raspberry Camera System (for LAR) REMOTE I/O CRio I/O ETHERNET CRio PCS DCS DSS Level Alarm Vaccum … HARDWIRED IN YOUR OFFICE LAPP Siemens Motorisation system 4
5
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP STATUS AND PLAN OF DETECTOR CABLING 5
6
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Phase 1: cable trays 200 mm 100 mm We defined cable trays to optimize cable routing. These should begin to be set up from 08/03/2016. Cable trays on the Top Cap 6
7
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Phase 2 & 3: Internal and external cabling The second phase of the installation consist in setting up the major part of sensors during the installation of the structure (Top Cap+CRP+Drift Cage). In phase 3, we will connect flanges to racks thanks to the cable trays. With this two phases, we will be able to do an “hot” test of the system of acquisition and the good cabling of our sensors. Cabling process: SensorsFlanges Racks 7 Phase 2 Phase 3
8
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Material for cabling 8 Connector Availability Cable Availability TemperatureOK PressureOK Heaters OK Trace AnalyzerOK High VoltageTo be ordered Level metersTo be ordered
9
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP RACKS STATUS 9
10
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Racks construction Distant Racks 10 CAEN Remote Racks
11
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP PVSS & COMMUNICATION 11
12
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP PVSS (WINCC-OA) CRP Control System Process Control System Detector Safety System Detector Control System Cryogenic Control System SLOW CONTROL Supervision & Control WinCC-OA CRYOGENIC CONTROL Supervision & Control WinCC-OA 12
13
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Slow Control System The supervision is almost done for the PCS, DCS and DSS so actually we work more on the CRP control system which use another technology (Siemens). 13
14
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP CRP Control System Status 14
15
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP CRP control system: tests at LAPP Tests were done with uncoupled motors – jacks and were processed with the Touch Panel Manual Modes and an elementary cycle have been implemented Some minor upgrades of the electrical rack are in progress at CERN Integration in PVSS has to be done Motors and jacks Electrical rack 15
16
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Integration in PVSS Architecture Definition of the communication between the Anode (CRP) Control System and the slow control Integration will be done soon Tests of the exchanges and of the global process will be carried out at CERN during the next weeks 16
17
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Foreseen Processing Manual Mode (ready with the Touch Panel) Homing (at the current position or at a given position) of the CRP plane (3 axes simultaneously) or of a selected axis Displacement of the plane in a jog mode (command in velocity up or down) Displacement of the plane or of a selected axis to a selected position Cycle Mode Test of an elementary cycle Implementation of algorithms to manage the failures Degraded modes have to be investigated more into details… Simplified synoptic of the cycle 17
18
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP PLANNING FOR THE 2 NEXT MONTHS 18
19
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Planning 08/03/2016: Cable trays 2 nd week of March 2016: Modif cablage rack LAPP + test 14/03/2016: BathTest 3rd week of March 2016: PVSS Motorisation integration End of April/May 2016: Internal cabling End of Mars/April 2016: Racks transfert 2 nd week of April 2016: CRP Global test on the top cap 3rd week April 2016: External cabling 19 4rd week of March 2016: Test Motorisation
20
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Thanks for your attention. 20
21
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP AFTER ? Date: Sept 2016 – end of the year 2016 The second phase of our installation is going to be made at the level of the final tank. Thanks to our box interface the major part of the sensors will be already tested and cabled. We will connecting and testing the other sensors but also of setting up the interconnections with the other systems (CRYO, LAPP, AREA…) 21
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.