Download presentation
Presentation is loading. Please wait.
Published byJocelyn Washington Modified over 8 years ago
1
June 2004 Craig Ogilvie 1 Strip Pilot Communication link between ladder and counting house Three optical fibers –Send serialized data –Receive control data –Receive beam clock Try to put no brains on the board Goal –Board to be used for barrel outer layers and endcap –If possible, use board design at both IR and counting house Serializer De-serializer Data out Control 16 bit Control/clock bus Data from bus clock
2
June 2004 Craig Ogilvie 2 Strip Requirements (TVC March 04) Two readout cards (ROC) per sensor –Each ROC has 6 SVX4 + FPGA / ASIC –8 ROCs per ladder –48 svx4 per ladder Volume per SVX4 –Each hit = 16 bit word –1 header –Total words/svx4 = 1+(num hits) = 1+(occ*128) Volume per ladder –Total words/ladder = 48+(occ*6144) Time = (48+(occ*6144))/40 MHz –< 40 microsec if occ < 25% Serialize each 16 bit word at 40 MHz
3
June 2004 Craig Ogilvie 3 Deserialize Control bus on ladder is 15 bits wide –Serialize control bits Use “same” board in counting house –Clock fiber different Serializer De-serializer Data out Control/clock in 16 bit Control/clock bus Data from bus Serializer De-serializer 16 bit Serializer De-serializer 16 bit IR Counting house
4
June 2004 Craig Ogilvie 4 Options for Serializer/Deserializer GOL –Only serializes TLK1501 (Texas Instrument) –Serializes/deserializes 16bits @ 30-60MHz »1.2Gbps –TLK2501 serializes @ 125 MHz => 2.5 Gbps –8bit /10 bit coding –Radiation tolerance? OASE (Heidelberg/Mannheim) –Serializes/deserializes 10bits @ 250MHz »2.5Gbps –On-chip laser diode (VCSEL) –Not yet available
5
June 2004 Craig Ogilvie 5 Endcap Requirements Each endcap has 4 z-stations and 24 sectors/station –96 pilot cards or output fibers –~6k channels / fiber PHX hit, minimum of 16 bits Total words / fiber = (num hits) = occ*6k Timing for LVL1, data off detector in ~0.5 microsec Try tlk2501 at max 125 MHz Time = (occ*6k)/125 MHz –< 0.5 microsec if occ < 1%
6
June 2004 Craig Ogilvie 6 Next Steps Iterate with Vince, Chi, John H. on requirements, skeleton of design –Work closely with ORNL Buy TLK1501/TLK2501 samples ($16 / piece) –Test on bench »Serialize/deserialize loop –Test in radiation environment »IR, elsewhere? Optical components –Depends on location in IR –If on ladder, CMS optical package used by pixel »ST Microelectronics –If on nosecone, many options
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.