CIMB ATM of PETRONAS Station at Bukit Subang Surge Protection Solution with Jan 07. 2012 GROUND CO., LTD Perfection Guarantee Security the 3 rd Generation Digital Grounding Apparatus for Perfect Lightning Surge Protection without Grounding US PATENT 7,652,865 B2 SIRIM TEST : IEC 61643-1 주소 : Petronas Gas Station, No8 (Lot 11509), Persiaran Metafasa, Seksyen U16, 40160 Shah Alam, Selangor, Malaysia
2
DateJob DetailRemark Oct. 10. 2011 Install Test version without “N-G” bonding Oct. 19. 2011 Site visit to check for Modem power off Check Power Line, report to Korea Modem power-off by surge Nov. 02. 2011 Site survey for ATM & Petronas Main DB upon guideline from Korea * eca3G N-G => 2.659 Volt * Main DB N-G => 2.528 Volt, ( Earth Leakage Relay is installed ) Survey surge damages of Petronas Station system => KIOSK system, Telephone line have surge damages. Nov. 05. 2011 Decide to install modelAir delivery. enable for N-G bonding Nov. 17. 2011 Install model with CTO of GROUND Co., Ltd 500 watt model PLAN After confirm best protection scheme, Prepare one-body type model Will change to one-body Model PROGRESS to find best protection under site environment *Site Condition : - ATM cannot connect to GROUND of Petronas Station - Power supply system is T.T grounding system, cannot N-G bonding - All equipment are aging status from frequent surge attack, very weak status
3
Sub DB Earth Leakage Relay
4
Maybank ATM Out of Order MayBank ATM – out of order Modem 1 Modem 2 Maybank ATM without is also Out Of Order. Maybank ATM has two Modems, One is ISDN modem and the other is Tellabs modem, If Tellabs modem has Problem, ISDN will support, but Two modems all down when we visited.
5
** Install model at Nov 17. 2011 with CTO of Ground Co., Ltd
6
connection / Nov. 17, 2011 for CIMB ATM Data Line Power Line Grounding Wall ATM Box ATM eca3G TN-C eca3G-BOLEH
7
** eca3G TN-C installation : Check before Installation
8
** eca3G TN-C installation : Power connection, Grounding cable to
9
** eca3G TN-C installation : Power connect to
10
Bukit Subang, Petronas 주유소 내, CIMB 은행 현금자동지급기ㅡ 방호
11
Jalan Metafasa U16/3, Shah Alam, Selangor, Malaysia