Presentation is loading. Please wait.

Presentation is loading. Please wait.

Main Campus is in Cedar Rapids, Iowa. Serving 7 Counties. WHERE IS KIRKWOOD COMMUNITY COLLEGE ?

Similar presentations


Presentation on theme: "Main Campus is in Cedar Rapids, Iowa. Serving 7 Counties. WHERE IS KIRKWOOD COMMUNITY COLLEGE ?"— Presentation transcript:

1

2 Main Campus is in Cedar Rapids, Iowa. Serving 7 Counties. WHERE IS KIRKWOOD COMMUNITY COLLEGE ?

3 All are ‘hands on’ labs for our students education. 417’ WIND TURBINE, EQUINE EVENTS FACILITY, HOTEL & CONFERENCE CENTER

4 The only teaching hotel at a 2 year college in North America

5 Via our Single Mode Fiber Infrastructure already in place. ONLY A FEW AREAS NEEDED DAS EXTENDED TO THEM

6 A PROPER SURVEY HELPS A LOT

7 1). Will the DAS be a Dedicated Single Service Provider or Neutral Host DAS 2). What Frequency Bands will need to be included per Service Provider 3). How will DAS be fed? BDA (repeater) or BTS (base station) 4). If DAS is to be BDA fed which in-building locations have sufficient coverage from the Macro. If BTS fed need to understand dominance over Macro requirements. 5). Obtain floor plans 6). Perform site survey to understand location of DAS Headend, Equipment Closets, Roof Penetration, Building Construction, etc. Include installation contractor as well. 7). Create DAS design. 8). Generate Quote. 9). After award of project, manage and install DAS. Additionally, … for BDA fed systems – re-broadcast agreements need to be obtained for BTS fed systems – work with service provider and local telco to facilitate BTS integration into network DAS GENERAL PROCESS STEPS

8 10). Commission DAS 11). Commission RF donors into DAS – typically will not occur at same time and will require multiple visits 12). Optimize DAS 13). As-Built/Close Out Documentation DAS GENERAL PROCESS STEPS

9

10

11

12 Proposed Antenna Locations Basement

13 -65 dBm -75 dBm -85 dBm RF Coverage Prediction Basement

14

15

16

17

18 -65 dBm -75 dBm -85 dBm RF Coverage Prediction Floors 3 & 4

19

20

21

22 Current Frequency Band Allocations

23

24

25

26 Feb. 25, 2010RFP for Kirkwood Community College DAS received Mar. 16, 2010Final response to RFP question and answers received Mar. 16, 2010Site Survey with installation partner performed at Kirkwood CC Mar. 24, 2010RFP Response Submitted Apr. 8, 2010Approximate date of project award Mid Apr. 2010Equipment placed on order and individual Service Provider donor re-broadcast process initiated May 20, 2010Equipment shipped from ADC Telecommunications. June 18, 2010DAS and US Cellular donor system installation complete June 22, 2010DAS and US Cellular commissioned Mid August 2010iWireless and Verizon donor system installations complete August 26, 2010iWireless and Verizon commissioned Mid Sept. 2010AT&T donor system installation complete Sept. 20, 2010AT&T commissioned KIRKWOOD CC DAS TIMELINE

27


Download ppt "Main Campus is in Cedar Rapids, Iowa. Serving 7 Counties. WHERE IS KIRKWOOD COMMUNITY COLLEGE ?"

Similar presentations


Ads by Google