Download presentation
Presentation is loading. Please wait.
Published byNora Boyd Modified over 8 years ago
1
Bill Christie For the STAR Collaboration June 15, 2015 1
2
2 Beam Ops. Cease ~ 8 am TPC/HFT Cosmics Remove W. BBC Drain and Blow out Magnet Coils Magnet Off Gas Purge Remove West Poletip & install Scaffolding Remove E. BBC
3
3 Set up for PXL removal Remove N & S PXL assemblies & PXL platform Remove East Poletip and Install scaffolding Miscellaneous maintenance efforts expected to occur throughout July Remove failed BSMD Fee cards
4
4 Miscellaneous maintenance efforts expected to occur throughout August RHIC Summer Sunday Open House
5
5 Miscellaneous maintenance efforts expected to occur throughout September BEMC Maintenance work Both ends of STAR
6
6 Miscellaneous maintenance efforts expected to occur throughout August BEMC Maintenance work Both ends of STAR
7
7 Dress W. TPC face & Remove W. scaffolding SGIS recertification and Fire alarm recertification Dress E. TPC face & Remove E. scaffolding Insert, attach, & hookup E. Poletip Install PXL platform Install & hook up N & S PXL assemblies
8
8 Fill and start Magnet H 2 O system Insert, attach, & Hookup West Poletip EEMC maintenance
9
9 2016 Magnet checkout & Heat run, TPC HV check Install & light check BBCs STAR ready for Cosmic Ray testing
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.