Download presentation
Presentation is loading. Please wait.
Published byAnne Paul Modified over 8 years ago
1
RUBBER TILES NORAMENT 825
2
INTRODUCTION FloorworX partners with nora® to bring South Africa sustainable commercial rubber flooring solutions Ergonomic, sound absorbent, stain and slip resistant, our norament® and noraplan® rubber flooring product collections offer you a broad variety of design options and speciality flooring applications to meet your flooring needs A comprehensive accessory collection, developed to complement nora® floor coverings, complete our range of products
3
BENEFITS NORAMENT 825_ High footfall sound absorption Superior Life Cycle Assessment (LCA) Exceptionally wear resistant Outstanding fire-resistant properties Largely oil and grease resistant Can be used on raised-access floors nora® rubber floor coverings do not contain any PVC, plasticizers (phthalates) or halogens (e.g. chlorine) Low maintenance Rubber flooring for heavy traffic areas Resistant to cigarette burns
4
INSTALLATION The norament® tile collection should be installed in accordance with manufacturer’s recommendations Sub-floors must be smooth, hard clean, and dry before laying commences Uneven, solid or suspended timber floors may need preparation to meet the required standard In case of direct to earth concrete, it is essential that a damp proof membrane is incorporated norament® must be allowed to relax for 24 hours in a uniform room temperature between 18°C and 27°C All sub-floors must be tested for moisture content prior to installation Recommended adhesive is FloorworX No.55 two-part polyurethane, but FloorworX No. 71 contact can be used in certain circumstances.
5
Supply and fix 3.2mm/4.0mm thick x 501mm x 501mm norament® 825/926/926 grano rubber floor tiles with round pastilles, manufactured in accordance with EN 14041 and laid in FloorworX No. 55 two-part polyurethane adhesive which has been spread using a trowel fitted with an A2 notched blade at a rate of approximately 12m2 per 6kg pack on a previously prepared Class 1 sub-floor in accordance with SANS 10070, using FloorworX Self Leveller when required, including all cutting and waste The flooring must be rolled in both directions with an articulated 68kg three-sectional roller immediately after it has been laid into the adhesive SUGGESTED SPECIFICATION
6
FloorworX offers a 5 year limited warranty, subject to our terms and conditions, against defective material provided that it is installed and maintained in accordance with our recommendations WARRANTY
7
Approximately 80% of the dirt and soiling that has to be cleaned off a floor has been trafficked in from outside the building More than 90% of that soiling can be avoided by the use of an effective entrance matting system. When less dirt is trafficked through the entrance there will be a reduction in maintenance requirements Regular cleaning is more cost-effective and hygienic than occasional heavy-duty cleaning Wipe up any grease and oil spills immediately and treat stains as soon as they are observed Black rubber wheels and rubber furniture feet can discolour the floorcovering. Hard plastic is preferred. Always follow the manufacturer’s dosage instructions regarding the use of cleaning chemicals. MAINTENANCE PREVENTIVE_
8
Floor maintenance begins immediately after the completion of installation The initial step is to remove any loose dirt or debris using a dry mop, broom or vacuum Sand, construction debris and sharp-edged objects may result in irreparable damage being inflicted to the new floor Remove any visible adhesive residue using a damp cloth. Once the adhesive has cured it will be difficult to remove If other trades are working in the building after the installation of the flooring, the floor must be protected from subsequent damage by the use of thick paper, cardboard or hard board No wet maintenance must take place until 72 hours (3 days) have elapsed from the time of installation (this is to ensure that the adhesive has sufficient time to cure properly and develop full bond strength) MAINTENANCE POST-INSTALLATION SITE CLEAN_
9
All Nora rubber flooring products have a waxy residue from the manufacturing process that must be removed as part of the initial maintenance procedure before the floor is used Nora floor coverings have a natural sheen and therefore do not require any artificial coating MAINTENANCE INTRODUCTION_
10
Dust mop or vacuum the floor to remove loose soil and dust Scrub the floor using a solution of FloorworX Maintain diluted 1:10 with clean water, with a rotary machine fitted with a blue pad for Norament tiles and a red pad for Noraplan sheeting Remove the residue immediately after scrubbing using a wet/dry vacuum Rinse with clean water using a flat mop and allow the floor to dry MAINTENANCE INITIAL CLEAN_
11
Dust mop with a flat mop or vacuum on a daily basis to remove dust and loose dirt Damp mop with a flat mop or auto-scrub the floor with a red cleaning pad Dry buff the floor using a rotary machine fitted with a white pad MAINTENANCE REGULAR CLEANING_
12
Apply a solution of FloorworX Maintain diluted 1:10 with clean water to the floor using a wet mop and allow to soak for 10 minutes Scrub the floor with a rotary machine fitted with a red pad Remove the residue immediately after scrubbing using a wet/dry vacuum Rinse with clean water using a mop and allow the floor to dry. MAINTENANCE OCCASSIONAL CLEANING_
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.