Presentation is loading. Please wait.

Presentation is loading. Please wait.

Microgravity User Support Center (MUSC) Payload Overview POIWG, July 2013 www.DLR.de Chart 1> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013.

Similar presentations


Presentation on theme: "Microgravity User Support Center (MUSC) Payload Overview POIWG, July 2013 www.DLR.de Chart 1> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013."— Presentation transcript:

1 Microgravity User Support Center (MUSC) Payload Overview POIWG, July 2013 www.DLR.de Chart 1> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

2 Overview -Materials Science Laboratory (MSL) -DOSIS 3D -Biolab -European Drawer Rack (EDR) -Overall MUSC Timeline www.DLR.de Chart 2> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013 MUSC

3 Overview MSL -SPLC Reboot -Overview -Way Forward -Ground Segment Evolution -Experiment Operations -Integration Overview -Schedule www.DLR.de Chart 3> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

4 MSL – SPLC Reboot – Overview -MSL Standard Payload Computer (SPLC) rebooted three times on-orbit -Once during heat-up before melting -Once in Cooldown -Last time during SETA2#4 processing -Known issue since before launch -EM experiences similar reboots -No safety impacts, no hardware damage www.DLR.de Chart 4> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

5 MSL – SPLC Reboot – Way Forward -Failure tree analysis ongoing -Prevention of reboots / minimizing of impacts -Approach of safety concerning re-melting of a sample -Minimizing science impact through sample re-processing -Due to no change in status of facility and low probability of reboot: -Continuation of science runs as soon as possible www.DLR.de Chart 5> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

6 MSL – Ground Segment Evolution [1/2] -Virtualization of MSL Ground Segment -Administration of base virtual machines -One for TReK machines -One for IVoDS machines -Linked clones for individual consoles -Modified and tested for new Increments / CoFR campaigns -Zero Clients instead of PCs at physical console locations -Gateway-to-gateway VPN connection between MUSC and HOSC www.DLR.de Chart 6> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

7 MSL – Ground Segment Evolution [2/2] www.DLR.de Chart 7> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013 Base Image TReK Base Image IVoDS 1 2 3 4 … 1 2 3 4 … MSL-Server display edit display clone

8 www.DLR.de Chart 8> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

9 MSL – Experiment Operations -MICAST MIcrostructure formation in CASTing of technical alloys under diffusive and magnetically controlled convective conditions -CETSOL Columnar to Equiaxed Transition in SOLidification processing -SETA Solidification along a Eutectic path in Ternary Alloys www.DLR.de Chart 9> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013 © DLR & ACCESS MICAST CETSOL

10 -Batch 1: -Batch 2a Set 1: -Batch 2a Set 2 successfully processed, launched but not processed, failed MSL – Experiment Operations: Status www.DLR.de Chart 10> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

11 MSL – Experiment Operations: Integration -11 Batch 2a samples currently on orbit -5 MICAST -5 CETSOL -1 SETA -6 samples to be downloaded on SpaceX-3 -5 samples to be downloaded on SpaceX-4 www.DLR.de Chart 11> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

12 MSL – Experiment Operations: Constraints -CETSOL2#2 -Re-validation of Sample Processing Programs necessary -To be processed before SpaceX-3 -CETSOL2#6 -Processing after CETSOL2#2 analysis on ground -SETA2#4 -Re-processing in discussion www.DLR.de Chart 12> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

13 MSL – Experiment Operations: Sequence -Current sequence of MSL Experiments: 1.CETSOL2 SCA#3 2.MICAST2 SCA#9 3.CETSOL2 SCA#4 4.MICAST2 SCA#10 5.CETSOL2 SCA#2 6.MICAST2 SCA#11 7.CETSOL2 SCA#7 8.MICAST2 SCA#12 9.MICAST2 SCA#13 10.CETSOL2 SCA#6 -SETA2 SCA#4 (status open) www.DLR.de Chart 13> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

14 MSL – Experiment Operations: Schedule -CETSOL2#6 processing targeted for Increment 39 -SETA2#4 re-processing open -Remaining samples to be processed in Increments 36-38 -1 SCA in Increment 36 -6 SCAs in Increments 37/38 -3 SCAs in Increments 39/40 -Gas Supply Drawer exchange in Increments 37/38 www.DLR.de Chart 14> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

15 DOSIS 3D www.DLR.de Chart 15> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013 -Located in Utility Interface Panel area of EPM -Constantly measuring radiation data

16 www.DLR.de Chart 16> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

17 DOSIS 3D – Mode Switch – Overview -Performed on GMT144 (24th May) -E-x review process as per Mission Operations Implementation Concept -Measurement timeframe < 4 days www.DLR.de Chart 17> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

18 www.DLR.de Chart 18> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013 DOSTEL-2 count/s (in 6.93cm²) / DoY 1 100 10 142144146 DOSIS 3D – Mode Switch – Results

19 DOSIS 3D – Mode Switch – Leasons Learned [1/2] -Science aspects -More data and better resolution for DOSTEL-1 -Technical aspects -Successful „commissioning“ of Mode 2 -Data rate higher than expected from ground testing (5 Mbyte / day) www.DLR.de Chart 19> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

20 DOSIS 3D – Mode Switch – Leasons Learned [2/2] -Operational aspects -Much longer data downlink time -Easy crew task (Execution Note only activity sufficient) -E-1 still too late for short notice / short duration events -Way forward -Trying to capture the next Solar Particle Event when detected -Consider possible improvements of reaction times www.DLR.de Chart 20> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

21 Biolab -Life Support Module Characterization -2 weeks in Increment 36 -Commissioning Run -2 weeks in Increment 36 -Gravi 2 support (for N-USOC) -4 weeks in Increment 38 -TripleLux-B -4 weeks in Increment 40 www.DLR.de Chart 21> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

22 European Drawer Rack (EDR) [1/2] -FASTER support (for MARS) -10 weeks in Increment 38 -T-Cell Act in Aging support (for BIOTESC) -2 days in Increment 38 -EDR Laptop usage in Increments 39/40 -Magnetic Flux Experiment (MFX) -2 weeks in Increment 40 www.DLR.de Chart 22> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

23 European Drawer Rack (EDR) [2/2] -Electromagnetic Levitator (EML) -Launched with ATV-5 -Commissioning in Increment 40 -Batch-1 in Increments 40/41 -Maintenance -ESEM Board Exchange (Inc. 37/38) -Laptop Transition (Inc. 39/40) -Software Upgrade for EML (Inc. 39/40) www.DLR.de Chart 23> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013

24 Overall MUSC Timeline www.DLR.de Chart 24> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013 Inc. 36Inc. 37Inc. 38Inc. 39Inc. 40… DOSIS 3D MSL Biolab EDR EML SpaceX 345 FASTER

25 -Head of MUSC: Rainer.Willnecker@dlr.de -MSL: msl-ops@dlr.de -DOSIS 3D: dosis-ops@dlr.de -Biolab: biolab-ops@dlr.de -EDR: edr-ops@dlr.de -EML: eml-ops@dlr.de MSL – Points of Contact www.DLR.de Chart 25> MSL Payload Overview > Patrick Hambloch POIWG > 2013-01-29 © DLR

26 Acronym List -CoFRCertification of Flight Readiness -DOSTELDOsimetry Silicon detector TELescope -EDREuropean Drawer Rack -EM Engineering Model -EMLElectromagnetic Levitator -EPMEuropean Physiology Module -ESEMExchangeable Standard Electronic Module -FASTERFacility for Adsorption and Surface TEntion Research -GMTGreenwich Mean Time -HOSCHuntsville Operations Support Center -Inc Increment -IVoDSInternet Voice Distribution System -MDCMSL Data Center -MFXMagnetic Flux Experiment -MUSC Microgravity User Support Center -MSL Materials Science Laboratory -MSRR Materials Science Research Rack -PCPersonal Computer -SPLCStandard Payload Computer -TReKTelescience Resource Kit -VPNVirtual Private Network www.DLR.de Chart 26> MSL Payload Overview > Patrick Hambloch POIWG > 2013-01-29