Download presentation
Presentation is loading. Please wait.
Published byNorah Andrews Modified over 8 years ago
1
Solar Probe Plus FIELDS Glaser – ME Slides for Quarterly July 18, 2013
2
FIELDS Personnel Change 2 Jeremy McCauley has moved to the ICON project David Glaser is the new FIELDS Mechanical Engineer Transition will take place over the next month
3
V1-V5 Antenna Mounting 3 Basic Design Finished for Stowed Mid-Antenna and Antenna Tip Mid Mount is a Monopod Forked Tip Mount
4
Breadboard Test 4 All Parts for Breadboard Model to be Fabricated by 7/31 Assembly and Deployment Testing in August Fixtures Being Made for FWB Torque and Temperature Tests Breadboard CAD Model
5
TTM Test at SAO SES All Parts Out for Fabrication – Hottest region thermal isolators will be sapphire Testing Planned for Late August 5 SES TTM CAD Model Niobium Shield Shadow/ Cooling Block Whip Segment Absorber Plate Incident Radiation Thermal Choke Region Thermal Isolation Region Ti Shield Clamp
6
Anomalous Melting on TTM in PROMES test Anomalous Melting in Ti Clamp and Stainless Screws Occurred in PROMES TTM Test – Suspect Interaction Between Silver Plating on Screws and other metals Need to Retest without Silver Present 6 Deformed Tapped Hole in Ti Melted Ti Flowed Over Ceramic Isolator
7
Vacuum Oven TTM Test Purpose: to bring Ti parts to flight temperatures without the presence of silver Using Spare TTM from PROMES Location: Vacuum Process Engineering, Sacramento Testing Planned for Week of 7/29 7
8
Antenna Capacitance Test All Parts Being Fabricated Assembly in Early August, 2013 Test to be Completed End of August, 2013 8 Capacitance Test Model
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.