INTRODUCTION Surestep is a 2m wide glass fibre-mat reinforced compact antistatic vinyl floor covering, featuring a 0.7mm thick wear layer The Surestep collection meets the class T requirement of EN 660-2 for abrasion resistance Surestep receives the unique PUR Pearl™ surface treatment, ensuring remarkable stain resistance, ease of maintenance and eradicates the need for waxing or sprayed refurbishment throughout the lifespan of the product Innovative, muted and sophisticated The holographic chips of Forbo’s Surestep Star safety vinyl collection add colour to the neutral palette The collection has a 100% PVC wear layer and R10 slip resistance It is available in 10 natural colours
3
BENEFITS Surestep contains no restricted substances Resistance to intense traffic Exceptional indentation resistance of 0,02mm PUR Pearl™ surface treatment Remarkable stain resistance R10 slip resistance Homogeneous multi-layer 50% natural 100% recyclable SURESTEP STAR_
4
INSTALLATION Surestep multi-layered homogeneous vinyl flooring must be installed in accordance with the manufacturer’s recommendations. Sub-floors must be level, smooth, hard, clean and dry before laying commences Uneven, solid or suspended timber floors may need additional preparation to meet the required standard Where there is direct to-earth concrete it is essential that an effective damp-proof membrane be incorporated Prior to installation, Surestep must be allowed to relax for 24 hours at a uniform room temperature of between 18°C and 27°C. All sub-floors must be tested for acceptable moisture content in accordance with SANS 10070 prior to the commencement of installation. Note that excessive moisture in the sub-floor will react adversely with the adhesive during the curing period The recommended adhesive is FloorworX No. 62 acrylic
5
Supply and fix 2.0mm thick x 2.0m wide Surestep R10 multi-layered homogeneous vinyl safety sheeting with PUR Pearl™ surface treatment, manufactured in accordance with EN 649 and laid in FloorworX No. 62 acrylic adhesive which has been spread using a trowel fitted with an A2 notched blade at a rate of between 5.5m2 and 6.5m2 per litre on a previously prepared Class 1 sub-floor in accordance with SANS 10070, using FloorworX Self Leveller when required, including all cutting and waste The sheeting must be rolled in both directions with an articulated 68kg three-sectional roller immediately after it has been laid into the adhesive Joins must be butted, grooved and heat welded using the manufacturer’s welding rod, ensuring that the welding rod bonds to more than 70% of the sheet thickness SUGGESTED SPECIFICATION
6
FloorworX offers a 5 year limited warranty, subject to our terms and conditions, against defective material provided that it is installed and maintained in accordance with our recommendations WARRANTY
7
Approximately 80% of the dirt and soiling that has to be cleaned off a floor has been trafficked in from outside the building More than 90% of that soiling can be avoided by the use of an effective entrance matting system. When less dirt is trafficked through the entrance there will be a reduction in maintenance requirements Regular cleaning is more cost-effective and hygienic than occasional heavy-duty cleaning Wipe up any grease and oil spills immediately and treat stains as soon as they are observed Black rubber wheels and rubber furniture feet can discolour the floorcovering. Hard plastic is preferred. Always follow the manufacturer’s dosage instructions regarding the use of cleaning chemicals. MAINTENANCE PREVENTIVE_
8
Floor maintenance begins immediately after the completion of installation The initial step is to remove any loose dirt or debris using a dry mop, broom or vacuum Sand, construction debris and sharp-edged objects may result in irreparable damage being inflicted to the new floor Remove any visible adhesive residue using a damp cloth. Once the adhesive has cured it will be difficult to remove If other trades are working in the building after the installation of the flooring, the floor must be protected from subsequent damage by the use of thick paper, cardboard or hard board No wet maintenance must take place until 72 hours (3 days) have elapsed from the time of installation (this is to ensure that the adhesive has sufficient time to cure properly and develop full bond strength) MAINTENANCE POST-INSTALLATION SITE CLEAN_
9
Dust mop or vacuum the floor to remove loose soil and dust Scrub the floor using a solution of FloorworX Maintain diluted 1:10 with clean water, with a rotary machine fitted with a blue pad or suitable brush / cylindrical brush machine when necessary Remove the residue immediately after scrubbing using a wet/dry vacuum Rinse with clean water using a flat mop and allow the floor to dry Dry buff the floor using a rotary machine fitted with a white pad MAINTENANCE INITIAL CLEAN_
10
Dust mop with flat mop or vacuum on a daily basis to remove dust and loose dirt Treat spills, spots and stains immediately. Spot clean by hand with a red or white pad and a diluted solution of FloorworX Maintain, working from the outside of the mark to its centre Dry buff periodically The frequency of dry buffing is dependent on the amount of foot traffic and the effectiveness of the daily cleaning regime Do not apply any sealers or polishes to the floor as they will reduce the slip resistant properties of the flooring MAINTENANCE REGULAR CLEANING_
11
Scrub the floor using a solution of FloorworX Maintain diluted 1:10 with clean water, with a rotary machine fitted with a blue pad or suitable brush / cylindrical brush machine when necessary Remove the residue immediately after scrubbing using a wet/dry vacuum Rinse with clean water using a flat mop and allow the floor to dry Dry buff the floor using a rotary machine fitted with a white pad MAINTENANCE OCCASIONAL MAINTENANCE_
Similar presentations