1 The application of GSM-R of Chinese railway Ministry of Railway of the People’s Republic of China
2
2 GSM-R of Chinese railway In 2002 , ministry of railway proposed that China should develop Train Control System which is suitable to ourselves (short for CTCS), confirmed GSM-R as Chinese railway integrated digital mobile communication network ; In 2003 , China began to design GSM-R network , recently we have Tibet line, Daqin line and Jiaoji line which use GSM-R technology , totally about 2100km long.
3
Ministry of Railway of the People’s Republic of China 3 I. Tibet line Overview Application service Project evolution
4
Ministry of Railway of the People’s Republic of China 4 i. i. Overview Totally 1142 kilometers, frozen area is 550 kilometers Use double-BSS system with co-site double-BTS- coverage 2 sets of core network equipments (MSC/network management equipment) 1 set of HLR/SGSN/IN/ MSC/network management equipment 4 BSCs 322 BTSs
5
Ministry of Railway of the People’s Republic of China 5 ii. Application service based on GSM-R ii. Application service based on GSM-R Dispatching communication Dispatching system based on GSM-R Improved train control system (ITCS)
6
Ministry of Railway of the People’s Republic of China 6 i ) Dispatching system based on GSM-R Dispatching Dispatching information information of train running number verified dispatching command shunting data train start-up and stopped information Data transmission via GPRS.
7
Ministry of Railway of the People’s Republic of China 7 ii ) ITCS – Improved train control system Wireless communication platform based on GPS and GSM-R Train’s integrality relies on 400MHz wireless communication at train’s head and tail Needless of signal machine and track circuit at section and station. With RBS technology, section use virtual blocking and stations use virtual interlock. Driver controls operating of the train by means of on-board MMI, the system is capable of ATP Applicable for the improving and speed-up of existed automatic blocking, also for the newly built railway which has no track circuit. Safe and economical train control system
8
Ministry of Railway of the People’s Republic of China 8 iii. Project evolution Nov.2003design of the test line Feb.2004construction of the test line July.2004completion and debugging of the test line Feb.2004construction of other lines Dec.2005completed equipment installation, started system debugging June.2006complete system debugging and network optimization for the whole line July.2006formal operation
9
Ministry of Railway of the People’s Republic of China 9 II. Daqin line Overview Application service Project evolution
10
Ministry of Railway of the People’s Republic of China 10 i. i. Overview Total 666km line with 385 bridges and 52 tunnels Use double-BSS system with co-site double- BTS-coverage 1 set of core network equipment (MSC/HLR/SGSN/GGSN/AuC) 2 BSCs 198 BTSs
11
Ministry of Railway of the People’s Republic of China 11 ii. Application service based on GSM-R LOCOTROL system Dispatching Communication Dispatching system based on GSM-R
12
Ministry of Railway of the People’s Republic of China 12 i ) Locotrol System Architecture
13
Ministry of Railway of the People’s Republic of China 13 ii ) Locotrol Data Transmission
14
Ministry of Railway of the People’s Republic of China 14 iii. Project evolution Sep.2004 , the project started Mar.2005 , construction of CN & single BSS completed Apr.2005~Dec.2005 , testing Basic function testing Field level testing QoS testing Feb.2006~Jun.2006 , reconstruction for double BSS
15
Ministry of Railway of the People’s Republic of China 15 III. Jiaoji line Overview Application service
16
Ministry of Railway of the People’s Republic of China 16 i. Overview 1 set of core network (MSC/HLR/GPRS/IN/network management equipment ) 1 BSCs 94 BTSs
17
Ministry of Railway of the People’s Republic of China 17 ii. Application service Dispatching communication Dispatching system based on GSM-R Maintenance communication
18
Ministry of Railway of the People’s Republic of China 18 IV. Development of GSM-R in China For future application Dedicated Passenger Line Overloading Transportation Railway in Middle and East of China The design of core network and signaling network
19
Ministry of Railway of the People’s Republic of China 19 Development of GSM-R in China(2) The construction of GSM-R network has been listed as part of the future development of the railway in China Plan to construct 3 TMSCs , 2 SCPs , 2STPs , 19GMSCs 。 Optimizing the number of GMSCs in terms of operation situation