Download presentation
Presentation is loading. Please wait.
Published byGwenda Hutchinson Modified over 8 years ago
1
Return Air Installation Return Air Installation
2
Installation Fundamentals Check the electrical service Room by room load calculation Select a matched system Design the distribution system Physical installation of the system Commissioning the system
3
Where to Place the Return? Central Location – Out of Direct Living Area
4
Air Handler Location ESP-3642
5
Flexible Return Duct (90° bend) Return Air Box Platform & Drain Pan 48” MIN. (6’ of duct) 96” MAX. (10’ of duct) copyright Mestek, Inc. 2004 Typical Attic Installation Up to 20’ or 0.25” W.C.
6
Protect your customers home copyright Mestek, Inc. 2004
7
Center the opening in the hallway
8
Drill pilot hole
9
Lay out return opening
10
Cut the hole
11
Remove framing only when necessary
12
Split Return Improves return air access Where rooms are decoupled from return 0.25” W.C. for entire return & filter Typically uses site-built mixing box
13
copyright Mestek, Inc. 2004 Make-Up Air
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.