Project 2: Biocomposite Sailing Dinghy Miho May Imaizumi Thomas O’Neill Ryan Garrahy
2
Project Plan May Design Overview Critical Load Cases Composite Structural Design Thomas Manufacturing Process Procurement Plan Budget Ryan Project Schedule Communication & Document Plan Risks/Opportunity Further testing
3
Design Overview
5
Critical Load Cases Load Cases Individual Load Conditions Impact Forces Collision with other dinghy during racing Collision with submerged object (rocks etc.) Collision with beacon post Beaching Manufacturing IssuesRemoval from mould Operational Loads Accidental gybe Self-weight
6
Materials Fibre Selection Good mechanical properties and durability in fluids High thermal degradation temperatures Compatibility with PA11 SisalFlax Hemp
7
Property & Compatibility Assessment Experimental critical fibre volume fraction (V f ) of natural fibre/thermoplastic composites Halphin-Tsai Model
8
Property & Compatibility Assessment E 1 (GPa)E 2 (GPa)G 12 (Gpa)ν 12 ν 23 Hm/PA113.92932.61180.72240.34360.3374 Fl/PA113.08042.16670.71120.90840.6797 Ss/PA1110.19893.67051.30600.38810.3874 Halphin-Tsai Results Compatibility Treatment CTDIC (Cardnol Derivative of Toluene Diisolyanate) Reduces hydrophilic nature of Sisal fibres Experimentally proven to improve bonding with thermoplastic matrix
9
Composite Design Structure Weave sisal fabric reinforcement Weave architectures: Plain-weave Twill-weaveMatt-weave
10
Composite Design Structure 6 PA11/Ss laminate skins 25mm Balsa wood core sandwich structure 3 Ss/PA11 laminates Balsa wood core
11
Composite Tests Ss/PA11 – New material! Unknown strengths Elastic moduli alone are not enough information to decide dimensions of the structure Safety factor (e.g. Tsai-Hill equations) ASTM composite tests ©Team E4
12
Procurement
13
Budget
14
Project Schedule
15
Stage 1. Design Review Stage 2. Procurement Stage 3. Prototype Testing Stage 4. Manufacturing and Assembly Stage 5. Handover
16
Project Schedule
17
Communication and Document Management
21
Risks
23
Opportunities
24
Testing
28
Thanks for Listening MECH3600 Team M2 Giving form and function to dreams