Presentation is loading. Please wait.

Presentation is loading. Please wait.

COEN 6741 Grading Scheme ► Test#1: 30% ► Test#2: 30% ► Project: 40%

Similar presentations


Presentation on theme: "COEN 6741 Grading Scheme ► Test#1: 30% ► Test#2: 30% ► Project: 40%"— Presentation transcript:

1 COEN 6741 Grading Scheme ► Test#1: 30% ► Test#2: 30% ► Project: 40%

2 COEN 6741 Grading Scheme ► Test#1: 30% ► Test#2: 30% ► Project: 40%

3 COEN 6741: Project Grading Scheme ► Project (40%)  60% Project Report  20% Project Presentation (Posters)  10% Participation (Peer Evaluation Form)  10% Project Demo (TA’s Evaluation)

4 COEN 6741: Project Grading Scheme ► Project (40%)  60% Project Report  20% Project Presentation (Posters)  10% Participation (Peer Evaluation Form)  10% Project Demo (TA’s Evaluation)

5 COEN 6741: Project Report   max. 20 pages (w/o code) 1) 1) Introduction 2) 2) Instruction Set Architecture Design and Encoding 3) 3) Datapath Design 4) 4) Control Unit Design 5) 5) Simulation and Testing Results 6) 6) Conclusions Handling Hazards

6 COEN 6741: Project Grading Scheme ► Project (40%)  60% Project Report  20% Project Presentation (Posters)  10% Participation (Peer Evaluation Form)  10% Project Demo (TA’s Evaluation)

7 COEN 6741: Project Presentation   Poster incl. Q&A 1) 1) Objective 2) 2) Instruction Set Architecture Design and Encoding 3) 3) Datapath Design 4) 4) Control Unit Design 5) 5) Simulation and Testing Results 6) 6) Conclusions 7) 7) Poster Quality 8) 8) Answering Questions Handling Hazards

8 COEN 6741: Project Grading Scheme ► Project (40%)  60% Project Report  20% Project Presentation (Posters)  10% Participation (Peer Evaluation Form)  10% Project Demo (TA’s Evaluation)

9

10 COEN 6741: Project Grading Scheme ► Project (40%)  60% Project Report  20% Project Presentation (Posters)  10% Participation (Peer Evaluation Form)  10% Project Demo (TA)  0% Confirmation of Originality (mandatory!)

11

12 COEN 6741: Project Deadlines ► Project Reports:  Wednesday April 6, before 5pm!  Dr. Tahar’s Mailbox in EV-05 ► Project Posters:  Thursday April 7 @ 11.45am!  Classroom: FG-B070 ► Project Demos:  Friday April 8, time/place TBD!

13 COEN 6741: Test #2 ► Test#2:  Thursday, March 31 @ 11.45am  Classroom:  Classroom: FG-B070  Last Office Hours ► Monday, March 28 @ 1:30-2:30pm  Topics …

14 COEN 6741: Test#2 Topics ► Instruction-Level Parallelism:  Loop Unrolling  Dynamic scheduling (Tumasulo)  Dynamic Branch Prediction (BHB, BTB)  Multiple Issue (Superscalar, VLIW, Vector) ► Memory Hierarchy Design  Memory Hierarchy (Organization, Access Time)  Cache (Organization)  Virtual Memory (TLB) ► Material allowed: Only Calculators (closed book!)

15 Good Luck Good Luck

16 COEN 6741: Another Last Remark

17 ► Do you know how much real time, resources and CPU time is used for Verification vs. Design?

18 COEN 6741: Another Last Remark ► Do you know how much real time, resources and CPU time is used for Verification vs. Design? ► 70%!

19 COEN 6741: Another Last Remark ► Do you know how much time, resources and CPU time is used for Verification vs. Design? ► 70%! ► COEN6541: Functional Hardware Verification by Dr. O. Ait-Mohamed ► COEN6551: Formal Hardware Verification by Dr. S. Tahar

20 COEN 6741: Really Last Remark

21 ► Teaching Evaluation Questionnaire

22 COEN 6741: Really Last Remark! ► Teaching Evaluation Questionnaire: Don’t forget to do it >!

23 COEN 6741: Really Last Remark! ► Teaching Evaluation Questionnaire: Don’t forget to do it on-line ASAP! … and now it’s time to go home! … and now it’s time to go home! Thank you & Good Luck Thank you & Good Luck


Download ppt "COEN 6741 Grading Scheme ► Test#1: 30% ► Test#2: 30% ► Project: 40%"

Similar presentations


Ads by Google