Download presentation
Presentation is loading. Please wait.
Published byShawn Owens Modified over 8 years ago
1
ITC250 Copyright 2008© ITC 1 Assessment -4- Choose the correct answer
2
ITC250 Copyright 2008© ITC 2 Q1- ….. state: The process is waiting to be assigned to a process Ready
3
ITC250 Copyright 2008© ITC 3 Q2- Process States are :new, running,waiting,and terminated. True False
4
ITC250 Copyright 2008© ITC 4 Q3- process execution must progress in sequential fashion. True False
5
ITC250 Copyright 2008© ITC 5 Q4- Short-term scheduler is invoked very frequently (milliseconds) and must be fast. True False
6
ITC250 Copyright 2008© ITC 6 Q5- Process Control Block (PCB) is Information associated with each process. True False
7
ITC250 Copyright 2008© ITC 7 Q6- Ready queue: set of all processes in the system. True False
8
ITC250 Copyright 2008© ITC 8 Q7- Message passing may be either blocking or non-blocking True False
9
ITC250 Copyright 2008© ITC 9 Q8- …...scheduler (or CPU scheduler) – selects which process should be executed next and allocates CPU. Short-term
10
ITC250 Copyright 2008© ITC 10 Q9- The long-term scheduler controls the degree of …… Multiprogramming
11
ITC250 Copyright 2008© ITC 11 Q10- process execution must progress in sequential fashion. True False
12
ITC250 Copyright 2008© ITC 12 Q11- ……a program in execution Process
13
ITC250 Copyright 2008© ITC 13 Q12- Message passing may be either blocking or non-blocking True False
14
ITC250 Copyright 2008© ITC 14 Q13- In direct Communication the link may be unidirectional, but is usually bi- directional True False
15
ITC250 Copyright 2008© ITC 15 Q14- Short-term scheduler (or CPU scheduler) controls the degree of multiprogramming. True False
16
ITC250 Copyright 2008© ITC 16 Q15- …... queues – set of processes waiting for an I/O device. Device
17
ITC250 Copyright 2008© ITC 17 Q16- Ready queue: set of all processes in the system. True False
18
ITC250 Copyright 2008© ITC 18 Q17- An advantage of process independence is Computation speed- up True False
19
ITC250 Copyright 2008© ITC 19 Q18- ……scheduler (or job scheduler) – selects which processes should be brought into the ready queue. Long-term
20
ITC250 Copyright 2008© ITC 20 Q19- Send and receive primitives may be either blocking or non-blocking. True False
21
ITC250 Copyright 2008© ITC 21 Q20- I/O-bound process – spends more time doing I/O than computations, many short CPU bursts. True False
22
ITC250 Copyright 2008© ITC 22 Q21- Long-term scheduler (or job scheduler) – selects which process should be executed next and allocates CPU. True False
23
ITC250 Copyright 2008© ITC 23 Q22- Process can migrate between the various queues. True False
24
ITC250 Copyright 2008© ITC 24 Q23- In Indirect Communication a link is associated with exactly one pair of communicating processes True False
25
ITC250 Copyright 2008© ITC 25 Q24- Process State waiting: the process is waiting for some event to occur. True False
26
ITC250 Copyright 2008© ITC 26 Q25- A process states are: new, running, waiting, ….., and terminated state. Ready
27
ITC250 Copyright 2008© ITC 27 Q26- Process Control Block (PCB) is Information associated with each process. True False
28
ITC250 Copyright 2008© ITC 28 Q27- Process Control Block (PCB) is Information associated with each process. True False
29
ITC250 Copyright 2008© ITC 29 Q28- Short-term scheduler (or CPU scheduler) – selects which processes should be brought into the ready queue. True False
30
ITC250 Copyright 2008© ITC 30 Q29- Operating system does not allow child to continue if its parent terminates. True False
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.