2
Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for Booster MMPS down for emergency repair. Scheduled Maintenance activities during the outage. Scheduled Maintenance activities during the outage. Official “Maintenance Days” after physics declaration. Official “Maintenance Days” after physics declaration. Friday treated same as MD. Friday treated same as MD.
3
Machine Status: LINAC and BLIP may run through the outage- NO ACCESS PLANNED. LINAC and BLIP may run through the outage- NO ACCESS PLANNED. AGS Controlled Access ~0900- 1600hrs. AGS Controlled Access ~0900- 1600hrs. RHIC and AtR opened in CA or RA during working hours. RHIC and AtR opened in CA or RA during working hours. Meeting to finalize schedule here, Thursday at 1500hrs. Meeting to finalize schedule here, Thursday at 1500hrs.
4
Major Jobs: PHENIX: PHENIX: AC repair. AC repair. Si detected insertion. Si detected insertion. e-Lens: e-Lens: Power tie-in. Power tie-in. Water tie-in. Water tie-in. Continued installation. Continued installation. AGS: AGS: Chiller work. Chiller work. Water System. Water System.
5
Tentative Schedule: 0800hrs: 0800hrs: Begin Accesses- AGS LOTO as necessary (begin early if RHIC store in progress). Begin Accesses- AGS LOTO as necessary (begin early if RHIC store in progress). RHIC access may be delayed slightly if store active. RHIC access may be delayed slightly if store active. 1600hrs: 1600hrs: Secure AGS, Restore systems. Secure AGS, Restore systems. Sweep RHIC as necessary. Sweep RHIC as necessary. 1800hrs: 1800hrs: Resume setup when power is restored. Resume setup when power is restored. Final details published 3/7. Final details published 3/7.