MyFloridaMarketPlace CRB Meeting MFMP 2.0 Upgrade Status December 19, 2006
2
Page 2 Agenda Review Project director update Status of the current CRs Groups/Roles Status of upgrade UAT and testing scripts Training and assessment survey Reports
3
Page 3 Project Director Update Introduction of Michael Johnston, MFMP Operations Manager and CRB Chair Audit Review Findings Customer Satisfaction Survey
4
Page 4 Status of Current Change Requests CR 3 – Payment History – Original design completed Amendment 1 to address PO balance update for exceptional situations Development in progress CR 6 – Hold Until date Development complete Testing in progress CR 25 – DO/MA on Invoice eForm Development Complete Testing in progress CR 27 – Negative Receipting The accepted field can only be reduced up to the amount that has already been paid You cannot create a receipt for an amount that has already been paid CR 28 – Workflow Regeneration – Completed
5
Page 5 2.0 Group and Role Structure Groups Group is a collection of permissions Reduce the number of roles Standardize roles Designed groups: Analysis, Contract Manager, Edit Accounting, eQuote, Invoicing, Purchasing, Requester, Req Approver Roles Roles will be used for PUI and statewide routing: For example: 7300: Purchasing Gatekeeper 7300: Purchasing Office 7300: Exception Handler 7300: Invoice Manager 7300: Fleet Approver
6
Page 6 MFMP 2.0 Group and Role Structure Current 8010: Cancellation Approver 8010: Contract Specialist 8010: Master Agreement Manager 8010: Purchasing Office 8010: System Administrator 8010: Purchasing Director Analysis Authorized CO No Workflow Exemption Authorized FA Requester Accnting edit Invoice Inquirer No Supervisor PO Not Sent Requester - eQuote Groups No Supervisor Analysis CO No Workflow Requester Purchasing Contract Manager eQuote Roles PUI Specific Roles New Red=Roles that will no longer be needed Green=MFMP 2.0 Roles
7
Page 7 MFMP 2.0 Upgrade – Plan Stage Status Plan Deploy Design AccomplishmentsIn progressUpcoming Development of 7.1 customized components Review of 8.2 test conditions System Test Pass 1 Workflow analysis Change Request evaluation Final upgrade scope Design of new key groups/roles/permissions Reporting assessment CR Designs System Test Pass 2 – 3 passes beginning (11/3 – 2/9/07) Training preparation Performance Testing/Tuning configuration UAT Script preparation 2 nd MFMP 2.0 Mock conversion Go/No go decision for April 07 1/19/07 2/28/07 3/29/07 Implementation planning Agency Training 3 rd (Final) MFMP 2.0 Mock Conversion * Bold indicates CRB participation may be requested Test Technical Infrastructure Build Train
8
Page 8 MFMP 2.0 Training Summary Anticipated levels of training (February and March 2007) What’s New Purchasing Refresher Training F/A Refresher Training System Administrator Training Current activities Training Assessment Survey Developing and coordinating training 7 weeks until Training begins
9
Page 9 User Acceptance Testing (UAT) Summary CRB membership designated agencies for UAT (2 seats per agency) UAT participation considered mandatory for CRB membership UAT dates 2/20/07 – 2/23/07 Current activities Selection & verification of business cases/ scripts Preparation of the UAT test environment Confirming logistics – test location, time, resources Validation of UAT entry/exit criteria (when can we start?/when are we complete and successful?) 9 weeks, 1 day until UAT begins
10
Page 10 MFMP 2.0 Reports Assessment Current SUN81 report analysis complete All Reports on the secure website were reviewed Recommendations for migration to 2.0 made Agencies were polled for current reports on the secure website Please also review and assess current reports and advise us of any changes/requests you may have Analysis will be upgraded as part of MFMP 2.0 Enterprise Reporting requirements analysis begin in January ‘07
11
Page 11 What’s Next? Any closing discussion January 30, 2007, Kirkman Building (HSMV); 2900 Apalachee Parkway Thank you! 14 weeks, 4 days until MFMP 2.0!