Download presentation
Presentation is loading. Please wait.
1
SSNAP July – Sep 2014 Cheshire and Merseyside http://www.rcplondon.ac.uk/ssnap ssnap@rcplondon.ac.uk
2
Introduction This slideshow is a graphical presentation of the July – Sep 2014 results for teams within your region Results are presented in 10 Domains covering 44 Key Indicators Each team’s SSNAP score is based on its domain scores adjusted for case ascertainment and audit compliance levels We hope you find this slideshow a useful resource when discussing SSNAP performance with teams within your region and using SSNAP results to drive change NB please refer to the named team full results portfolio and summary spreadsheet for more detailed results Source SSNAP July– Sep 2014 Report
3
Presentation of results The slideshow presents detailed results covering all 10 SSNAP domains and 44 key indicators for routinely admitting teams in your region results for the 3 therapy domains and associated key indicators for non-routinely admitting teams and/or non-acute inpatient teams (subject to sufficient data being entered by these teams) Each graph will clearly state whether it is displaying team-centred (i.e. based on the care patients received while in each team’s care) or patient-centred results (i.e. based on the care patients received across their stroke pathway)
4
Additional July – Sep 2014 Reporting Outputs Full results portfolio Detailed results for every data item (team-centred and patient- centred 72h results and post-72h results) Also includes casemix, case ascertainment, audit compliance, transfer tree and patient cohort information. Summary results spreadsheet 44 indicators within 10 domains Public report (PDF) National level results with clinical commentary Colour coded scoring summary for named teams Dynamic Maps Compare different standards of care within each hospital Compare hospitals against each other and against regional and national averages
5
Availability of results in public domain The following will be available to download from the RCP website in the coming weeks: National level results for entire care pathway including preliminary data for domiciliary teams ( PDF report) See the SSNAP results portal http://www.strokeaudit.org/results/national- results.aspx Named team level results for entire inpatient care pathway (Excel spreadsheets) Full results portfolio Summary results portfolio Regional slideshows www.rcplondon.ac.uk/ssnap/clinical-audit Dynamic maps will also be available on the RCP website www.rcplondon.ac.uk/ssnap/maps
6
Overview of this presentation Overview Number of patients per team for 72h and post-72h results Number of teams in your region achieving each scoring level Combined total key indicator score with case ascertainment and audit compliance adjustments Audit compliance NIHSS scores on arrival and 24 hours after thrombolysis Results in more detail Results by domain Results for key indicators within each domain
9
Patient-Centred Performance Table
10
Team-Centred Performance Table
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.