(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news
2
(2/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam
3
(3/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam IRRAD proton facility PH/DT 24 GeV/c proton beam LHC experiments
4
(4/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam CHARM R2E Project
5
(5/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam Technical local Connection to the radiation area
6
(6/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam Control room Dry run test
7
(7/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam Platform for the Dry Run test of heavy equipment e. g. UPS, Power converters
8
(8/17) 14/11/13 – RadWG meeting CHARM 24 GeV/c proton beam
9
(9/17) 14/11/13 – RadWG meeting Target storage area
10
(10/17) 14/11/13 – RadWG meeting Conveyer news Visit to SEAQX: Very small but reactive company Technically very competent Technical solution feasible, design study on-going Purchase: SEAQX serious candidate (technically), however very small company (discussions with EN/HE on- going) EN/HE contacted also other companies in parallel (no news for the moment)
11
(11/17) 14/11/13 – RadWG meeting Conveyer News
12
(12/17) 14/11/13 – RadWG meeting Conveyer path
13
(13/17) 14/11/13 – RadWG meeting Conveyer path
14
(14/17) 14/11/13 – RadWG meeting Montrac conveyer o Montrac Rail: Possibility to use a software + screen to control it Location of the control rack to be discussed Can be installed inside a 19’’ Rack
15
(15/17) 14/11/13 – RadWG meeting Montrac conveyer Implementation Hypertack 6 NE48 (RadTOL)
16
(16/17) 14/11/13 – RadWG meeting Rail system for cables: Rail system Shielding Door Ventilation door Access door Contact with Conductix: Propose a complete solution for the system To be tested in the mock-up Other manufacturers contacted in parallel
17
(17/17) 14/11/13 – RadWG meeting Mock-up The Mock-up is being updated Maximum difference between layout and mock-up: 10 cm. Difference > 5 cm will be indicated on the floor In addition, ‘Beams’ have been installed at a height of 3 m in order to install the cable holder chain and for future use (installation of the rails). Installation foreseen soon: Montrac (system + control) The cable holder chain The rail system Installation of services (compressed air, etc …) Thanks to the team
18
(18/17) 14/11/13 – RadWG meeting Other Information Target: Three fixed installed target for varying beam intensity Materials Aluminium (×2) and copper (×1) (allowing for intensity reduction of about 2.5 and 4) Second aluminium target shall include longitudinal holes to allow for the largest reduction (/4) 1 empty slot (e.g. direct beam sample tests) Particle energy spectra: Draft report in iteration (Ruben) Website: The website is being developped and will be updated along the time. http://charm.web.cern.ch/CHARM/ After several iterations with the users, the cables list is now frozen (will be available soon on the website)