(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.

Similar presentations


Presentation on theme: "(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news."— Presentation transcript:

1 (1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news

2 (2/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam

3 (3/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam IRRAD proton facility PH/DT 24 GeV/c proton beam LHC experiments

4 (4/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam CHARM R2E Project

5 (5/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam Technical local Connection to the radiation area

6 (6/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam Control room Dry run test

7 (7/17) 14/11/13 – RadWG meeting East Area Facilities 24 GeV/c proton beam Platform for the Dry Run test of heavy equipment e. g. UPS, Power converters

8 (8/17) 14/11/13 – RadWG meeting CHARM 24 GeV/c proton beam

9 (9/17) 14/11/13 – RadWG meeting Target storage area

10 (10/17) 14/11/13 – RadWG meeting Conveyer news  Visit to SEAQX:  Very small but reactive company  Technically very competent  Technical solution feasible, design study on-going  Purchase:  SEAQX serious candidate (technically), however very small company (discussions with EN/HE on- going)  EN/HE contacted also other companies in parallel (no news for the moment)

11 (11/17) 14/11/13 – RadWG meeting Conveyer News

12 (12/17) 14/11/13 – RadWG meeting Conveyer path

13 (13/17) 14/11/13 – RadWG meeting Conveyer path

14 (14/17) 14/11/13 – RadWG meeting Montrac conveyer o Montrac Rail:  Possibility to use a software + screen to control it Location of the control rack to be discussed Can be installed inside a 19’’ Rack

15 (15/17) 14/11/13 – RadWG meeting Montrac conveyer  Implementation  Hypertack  6 NE48 (RadTOL)

16 (16/17) 14/11/13 – RadWG meeting  Rail system for cables: Rail system Shielding Door Ventilation door Access door  Contact with Conductix:  Propose a complete solution for the system  To be tested in the mock-up  Other manufacturers contacted in parallel

17 (17/17) 14/11/13 – RadWG meeting Mock-up The Mock-up is being updated Maximum difference between layout and mock-up: 10 cm. Difference > 5 cm will be indicated on the floor In addition, ‘Beams’ have been installed at a height of 3 m in order to install the cable holder chain and for future use (installation of the rails). Installation foreseen soon: Montrac (system + control) The cable holder chain The rail system Installation of services (compressed air, etc …) Thanks to the team

18 (18/17) 14/11/13 – RadWG meeting Other Information  Target: Three fixed installed target for varying beam intensity Materials Aluminium (×2) and copper (×1) (allowing for intensity reduction of about 2.5 and 4)  Second aluminium target shall include longitudinal holes to allow for the largest reduction (/4)  1 empty slot (e.g. direct beam sample tests)  Particle energy spectra: Draft report in iteration (Ruben)  Website: The website is being developped and will be updated along the time.  http://charm.web.cern.ch/CHARM/  After several iterations with the users, the cables list is now frozen (will be available soon on the website)