New Refrigeration Measures -Status Report- & -Request for Input- September 13, 2010
2
Acknowledgements We would like to thank the following for their support: Avista Utilities Bonneville Power Administration Puget Sound Energy
3
3 Agenda Objectives of RTF subcommittee meeting New measure presentation –Floating/Reduced Head Pressure Control for Stand Alone Refrigeration Compressors Next steps
4
4 Objectives for 9/13 RTF subcommittee meeting Feedback on assumptions and methodology for new measure –Subcommittee questions to be addressed and incorporated into RTF presentation Approval of energy savings analysis approach Support at full 9/28 RTF presentation
5
Evaporative Pre-cooling for Refrigeration Condensers Barbara Theus Ben Wright
6
Measure Status Update Modeling and sensitivity analysis complete Further progress postponed until metered data is collected to verify model
7
Floating Head Pressure Control for Stand Alone Refrigeration Compressors Ben Cartwright Dustin Bailey
8
Technology Overview This measure requires using controls and/or expansion valve retrofits to change (lower) a fixed head pressure setpoint Allows condenser to operate at a lower temp. depending on ambient conditions and system demand Lower condenser temp. operation = less compressor work, more condenser fan energy Compressor efficiency increases due to discharge pressure decrease
9
Variable Assumptions
10
Tornado Diagram
11
Calculation Methodology/Sensitivity Analysis Baseline eQuest model –Set at “typical” specifications Retrofit case eQuest model –Modified SCT setpoint to 70 F Energy Savings = 607 kWh/compressor hp Holding all other variables at typical value, simulate model changing one variable to min or max. Simulate for each variable.
12
Sensitivity Analysis Investigation Analyze variable sensitivity –Variables/assumptions from sensitivity analysis output that affect savings most will be investigated Variable savings will be weighted based on sensitivity analysis output Final proposed deemed energy savings computed
13
Cost – Balance Port TXV $158.28 per evaporator –Valve and labor $592.31 per condenser –Adjustable flood valve, filter drier, bypass valve and labor
14
Next Steps Confirm and weight savings Determine EUL Finalize costs/hp of compressor Calculate BC ratio
15
Questions
16
Next Steps
17
17 Revisit objectives for 9/13 RTF subcommittee meeting Feedback on assumptions and methodology for new measure Approval of energy savings analysis approach Support at full 9/28 RTF presentation
18
18 Next steps 9/13-9/20: Address any outstanding questions from RTF subcommittee. 9/20 or sooner: Send final analysis and table to RTF. 9/28: RTF final presentation and request for approval of new measures.
19
19