Presentation is loading. Please wait.

Presentation is loading. Please wait.

Science Exhibition HYDRO-ELECTRICITY PROJECT. MEMBERS IN OUR GROUP: SREEJAN R. MAHANTA (Group Leader) JASRAJ SARMA SWAGATMITRA BHATTACHARYA ANUBHAV DAS.

Similar presentations


Presentation on theme: "Science Exhibition HYDRO-ELECTRICITY PROJECT. MEMBERS IN OUR GROUP: SREEJAN R. MAHANTA (Group Leader) JASRAJ SARMA SWAGATMITRA BHATTACHARYA ANUBHAV DAS."— Presentation transcript:

1 Science Exhibition HYDRO-ELECTRICITY PROJECT

2 MEMBERS IN OUR GROUP: SREEJAN R. MAHANTA (Group Leader) JASRAJ SARMA SWAGATMITRA BHATTACHARYA ANUBHAV DAS ZIYAD ZAMAN SIDDHART BOSE NAVAJEET BHAGAWATI

3 Kinetic energy is the energy of motion. Any moving object has kinetic energy.

4 Humans first learned to harness the kinetic energy in water by using waterwheels. A waterwheel is a revolving wheel fitted with blades, buckets, or vanes. Waterwheels convert the kinetic energy of flowing water to mechanical energy. This later gave the idea of Hydro-power.

5 What Is Hydro- electricity? Hydro electricity is the term referring to electricity generated by hydro power ; the production of electrical power through the use of the gravitational force of falling or flowing water. It is the most widely used form of renewable energy. Once a hydroelectric complex is constructed, the project produces no direct waste, and has a considerably lower output level of the carbon dioxide (CO 2 ) than fossil fuel powered energy plants.

6 History Of Hydro- electricity. Hydro power has been used since ancient times to grind flour and perform others tasks. In the mid-1770s, a French engineer Bernard Forest de Belabor published Architecture Hydraulique which described vertical- and horizontal-axis hydraulic machines. In the late 1800s, the electrical generator was developed and could now be coupled with hydraulics. The growing demand for the Industrial Revolution would drive development as well. In 1878, the world's first house to be powered with hydroelectricity was Cragside in Norththumberland England. The old Schoelkopf power station No 1 near Niagara falls in the U.S. side began to produce electricity in 1881.

7 Hydro-Power Plant

8 Turbine Blades Of A Dam

9 Hydro-Power Plant (Small Amount Energy)

10 Conversion of Water To General Electricity Water in dam (P.E.) Turbine (M.E.) Generator ( E) Nozzle (K.E.)

11 General Layout Of a Dam

12 Inside of a Hydro-Power Plant

13 Methods To Generate Hydro-power There are four methods to generate Hydro electricity :-  Tide  Pumped-storage  Run-of-the-river  Conventional

14 Types Dams

15 Simple View Of a Dam

16 Inside Of A Generator

17 Block Diagram of A Dam DAMTURBINE POWER HOUSE INTAKE GENERATOR PENSTOCK RESEVOIR POWER LINE TRANSFORMER

18 World Renewable Energy Potential

19 Types Of Dam on The Basic Of Size Pico hydroelectric plant Micro hydroelectric plant Small hydro electric plant Mini hydroelectric plant Medium hydroelectric plant Large hydroelectric plant

20 Advantages Of Hydro- electricity Renewable, non-radioactive & non-polluting source of Energy Reliable, clean and efficient Energy Source. Low cost of generation Low operation & maintenance charges Inherent ability for quick starting, stopping & instantaneous load acceptance/ rejection Meet peak load requirement. Avoided Green House Gas (GHG) emissions from equivalent thermal and other fuel based power projects Increase in Agriculture Productivity through development of irrigation and multipurpose schemes Flood Mitigation through large storage dams

21 Disadvantages Of Hydro-electricity Ecosystem damage and loss of land Siltation Flow shortage Methane emissions (from reservoirs) Relocation Failure hazard

22 Major Hydro-power Generating Unit Projects in India

23 NAME STATE CAPACITY (MW) BHAKRA PUNJAB 1100 NAGARJUNA ANDHRA PRADESH 960 KOYNA MAHARASHTRA 920 DEHAR HIMACHAL PRADESH 990 SHARAVATHY KARNATAKA 891 KALINADI KARNATAKA 810 SRISAILAM ANDHRA PRADESH 770

24 Top 10 Countries Who Generate & Use Hydro- power

25 NAME POWER CAPACITY INSTALLED CAPACITY TAJIKISTAN 527000 400 CANADA 341312 66954 USA 319484 79511 BRAZIL 285603 57517 CHINA 204300 65000 RUSSIA 160500 44000 NORWAY 121824 27528 JAPAN 84500 27229 INDIA 82237 22083 FRANCE 77500 77500

26 Hydro-power Generated From Different States Of India

27 S.NoStateTotal NumberTotal Capacity 1Andhra Pradesh43104.43 2Assam10.10 3Gujarat25.6 4Himachal Pradesh63271.25 5Haryana27.4 6Jammu & Kashmir217.5 7Karnataka95694.90 8Kerela336.00 9Madhya Pradesh12.20 10Maharashtra1374.00 11Orissa232.00 12Punjab1826.20 13Tamil Nadu10.35 14Uttaranchal1048.30 15West Bengal56.45 Total2611326.68

28 Selections Of Sites For Hydro-power. Availability of water Water storage Water head Distance from the load center Accessibility of site Water pollution Sedimentation Large catchment area Availability of land There should be stream diversion during the period of construction.

29 The Time Taken To Build An Average Micro-Dam Is 3 ½ Years.

30 Because the water cycle is continuous, hydropower is a renewable energy source.

31 Even Though Hydro- electricity is Renewable, We Must Save It.

32

33


Download ppt "Science Exhibition HYDRO-ELECTRICITY PROJECT. MEMBERS IN OUR GROUP: SREEJAN R. MAHANTA (Group Leader) JASRAJ SARMA SWAGATMITRA BHATTACHARYA ANUBHAV DAS."

Similar presentations


Ads by Google